VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalChina Registry: RegisteredACM0001

Shizaiqian MSW landfill site LFG recovery to power project

VCS-2352 ↗

#855of 1084 in China#968of 1339 in Verra (VCS)#102of 159 in ACM0001

4.6/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

The Shizaiqian LFG-to-power project is a renewable energy project with VVB-confirmed additionality and reasonable leakage treatment, but the verification report identified 13 material findings including an incorrect ER calculation, incomplete monitoring parameters, and a CO2/CH4 baseline inconsistency. Six contradictions across documents (baseline type, additionality test, grid EF, ERR figures, legal capture requirement, and crediting period dates) reduce confidence in data reliability. The project is functional but carries moderate over-crediting and documentation-quality risk.

Red Flags

  • The verification report explicitly states the ER calculation for the project is not correct, a material finding that was raised as a corrective action
  • Thirteen material findings and thirteen corrective actions were identified in the verification report, indicating systemic quality issues in the monitoring and verification process
  • Six contradictions exist across project documents, including conflicting baseline type (measured vs. modeled), additionality test type (investment vs. combined), and whether LFG capture is legally required
  • Ex-post monitoring parameters are incomplete per the methodology, and the FCH4,BL,y calculation was found to incorrectly account for equipment working hours
  • Inconsistency between the PDD and verification report regarding inclusion of CO2 versus CH4 in baseline emissions

Credit Vintages

IssuedRetiredAvailable
2019
59,811059,811
2020
124,7190124,719
2021
159,730104,54655,184
2022
160,405110,40550,000
2023
62,52062,5200
Total567,185277,471289,714

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Renewable project, no reversal risk

Leakage

0% deemed negligible, reasonable for LFG-to-power

Baseline

Project-specific, measured, reassessment timing not stated

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents