Sidrap Wind Farm Project Phase 1
GS-1618 ↗ · current registry ID: GS4813
#985of 1935 in Renewable energy#13of 33 in Indonesia#637of 1801 in Gold Standard (GS)#777of 1287 in ACM0002
Audit Analysis
The Sidrap Wind Farm Phase 1 is a Gold Standard wind project with VVB-confirmed additionality and a conservative verified emission reduction (97.5% of pro-rata expectation), but is undermined by a project-specific baseline, a 0% leakage deduction with inconsistent justification, and a large volume of material findings (28) and corrective actions (10) that raise concerns about monitoring quality and documentation rigour.
Red Flags
- 28 material findings in the verification report, including a 217-day delay in energy meter calibration (due May 2020, completed May 2021) and a WTG capacity inconsistency between the PDD (2.5 MW) and site inspection (2.625 MW)
- Leakage deduction of 0% with justification described as 'not addressed' in one part of the verification report and 'deemed negligible' in another, creating an internal inconsistency
- Contradiction in total ERR figures: 141,248 tCO2e in the November 2021 verification report versus 252,115 tCO2e in the June 2021 verification report — the earlier figure represents 178% of the pro-rata annual expectation
- Crediting period stated as 2018–2028 in the verification report but 2020–2030 in the monitoring report, creating uncertainty about the project's actual crediting window
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 119,115 | 119,115 | 0 | |
| 2019 | 156,495 | 156,495 | 0 | |
| 2020 | 137,468 | 132,468 | 5,000 | |
| 2021 | 112,173 | 45,103 | 67,070 | |
| Total | 525,251 | 453,181 | 72,070 |
Risk Indicators
VVB-confirmed combined test
Wind avoidance – no reversal risk
0% deduction, inconsistent justification
Project-specific, reassessment not stated
Grievance & benefit sharing present, FPIC not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.