Silk Grass Biochar Project

VCS-5035 ↗

#60of 61 in Biochar#1306of 1339 in Verra (VCS)#5of 5 in VM0044

2.5/ 10
Integrity
2.5
Transparency
2.0
Claim Safety
3.0
Documentation
2.8

Audit Analysis

The Silk Grass Biochar Project in Belize presents significant quality concerns: 28 material findings and 28 corrective actions were raised during validation, the leakage deduction of 0% rests on a justification the VVB found inadequate, no buffer pool is in place to address biochar permanence risk, and a 72% reduction in the claimed lifetime ERR between two PDD versions raises questions about the robustness of the original quantification. The project lacks a monitoring report, verified ERR figures, and several key MRV parameters, leaving the credit claim largely untested against real-world performance.

Red Flags

  • 28 material findings and 28 corrective actions identified in the validation report, including unresolved gaps in baseline documentation, biochar processing emissions, and monitoring procedures
  • Leakage deduction of 0% justified as 'deemed negligible,' yet the VVB explicitly noted that transportation leakage was assumed zero without adequate justification or monitoring
  • No buffer pool or non-permanence risk analysis in place for a biochar project where carbon sequestration permanence is inherently uncertain
  • Double-counting risk with a REDD+ project boundary was flagged as a material finding and not adequately addressed in the PDD or validation report
  • 72% reduction in lifetime ERR between the July 2024 PDD (45,500 tCO2e) and the March 2026 PDD (12,886 tCO2e), indicating the original claim was substantially overstated
  • Permanence claim not stated in available documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool; biochar degradation risk unaddressed

Leakage

0% deduction; VVB found justification inadequate

Baseline

Project-specific; no reassessment date stated

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA/CCP status unknown; REDD+ overlap flagged

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03VM0044

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents