Soil Carbon Improvement Project through Grassland Management, in South Africa

VCS-2710 ↗

#94of 261 in Soil carbon#18of 59 in South Africa#743of 1339 in Verra (VCS)

5.0/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
3.5
Documentation
6.5

Audit Analysis

A VCS soil carbon project in South Africa with VVB-confirmed additionality and an 18% buffer pool, but significant methodological concerns including a zero-leakage claim the VVB itself flagged as insufficiently assessed, a project-specific baseline, and a verified ERR that is roughly 4.4× the pro-rata expectation derived from the VVB's own lifetime ex-ante estimate. Multiple contradictions across documents—particularly in the ex-ante lifetime ERR and buffer pool percentage—undermine confidence in the underlying data.

Red Flags

  • Verified ERR of 984,785 tCO2e is approximately 439% of the pro-rata expectation (224,455 tCO2e) calculated from the VVB's ex-ante lifetime estimate of 997,577 tCO2e over the 4.5-year monitoring period out of a 20-year crediting period, raising serious over-crediting concerns.
  • Zero leakage deduction justified as 'deemed negligible' was explicitly flagged by the VVB as an 'insufficient assessment of zero leakage' in the material findings.
  • The VVB noted 'insufficient demonstration of SOC estimations conservativeness and zero uncertainty' and that the 'allometric equation appropriateness [was] not demonstrated,' indicating methodological weaknesses in the core carbon accounting.
  • A major contradiction exists in the ex-ante lifetime ERR: the verification report states 997,577 tCO2e while the monitoring report states 4,429,631 tCO2e—a 4.4× discrepancy that fundamentally changes the over- vs under-delivery assessment.
  • Internal Risk was rated at 17 due to financial viability and project longevity factors, and a Forward Action Request was raised regarding Non-Permanence Risk Report compliance.

Credit Vintages

IssuedRetiredAvailable
2018
89,222089,222
2019
179,6990179,699
2020
177,7640177,764
2021
179,6770179,677
2022
179,609209179,400
Total805,971209805,762

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

18% buffer, no reversals, but internal risk 17 and FAR on non-permanence report

Leakage

0% deduction, 'deemed negligible' flagged as insufficient by VVB

Baseline

Project-specific baseline; reassessment not yet due (10-yr rule)

Safeguards

FPIC conducted, grievance mechanism present, safeguards documented

Double-claim

CORSIA and CCP status both not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03VM0026

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents