4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A 5 MW grid-connected solar project in Rajasthan using the standard AMS-I.D methodology, with VVB-confirmed additionality and a recent (2023) baseline reassessment. However, the verification process surfaced over 30 material findings and corrective actions covering missing calibration records, inconsistent dates, a lease agreement shorter than the crediting period, and gaps in stakeholder consultation documentation, which collectively undermine confidence in the project's data quality and administrative robustness.

Red Flags

  • Lease agreement between Refex Refrigerants and Essel Mining is valid for only 3 years while the crediting period spans 10 years (2021–2031), creating a potential legal-tenure gap
  • Consent to Operate from the state pollution control board was not available at the time of validation and was flagged as a Finding of Additional Requirement
  • Over 30 material findings and corrective actions were raised across verification reports, including missing meter calibration certificates (2018, 2019), inconsistent commissioning dates, and missing stakeholder consultation records
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable or incomplete

Credit Vintages

IssuedRetiredAvailable
2011
32,14932,1490
2015
2,7532,7530
2016
8,3998,3990
2017
8,2138,2130
2018
8,0058,0050
2019
8,1128,06646
2020
8,0198,0190
2021
6,5016,5010
2022
7,1973,9193,278
2023
5,71805,718
Total95,06686,0249,042

Risk Indicators

Additionality

VVB-confirmed additionality test

Permanence

Solar project – no reversal risk

Leakage

0% deduction, negligible for grid-connected solar

Baseline

Project-specific baseline, reassessed 2023

Safeguards

Grievance mechanism present; FPIC not stated; VVB safeguards

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS-I.D., Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents