Solar Power Project by Dalmia Cement in Assam
#791of 1935 in Renewable energy#392of 975 in India#486of 1339 in Verra (VCS)
Audit Analysis
A VCS-registered solar power project (AM0123) by Dalmia Cement in Assam with a jurisdictional grid baseline and VVB-confirmed additionality, but the verification report flags eight corrective actions covering double-claiming risk, captive-user definition, project boundary scope, and stakeholder consultation timing. The project delivered roughly 90% of its pro-rata ex-ante expectation for the first monitoring period, which is within normal solar variability, yet the unresolved material findings and documentation quality issues temper confidence in the credit's integrity.
Red Flags
- Material finding CL 04 explicitly raises a double-claiming and Scope 3 emissions concern that has not been resolved in the available documents
- Eight corrective actions remain open, including defining the captive user, demonstrating VCS eligibility via wheeling, and removing BESS/hydro emissions from the project boundary
- Stakeholder consultation dates were found to be inconsistent with VCS standard timing requirements relative to project start
- Contradiction between the PDD (benefit sharing described) and the verification report (not described) leaves community benefit claims unverified
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed (investment/combined test)
Avoidance project – no reversal risk
0% deduction, deemed negligible (solar PV)
Jurisdictional grid EF (2023, 0.9352 tCO₂/MWh)
FPIC contradiction; consultation timing non-compliant
CL 04 double-claiming concern unresolved; CORSIA/CCP not sta
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →