Solar Powered Irrigation Services by Claro Energy, India
#631of 1935 in Renewable energy#310of 975 in India#368of 1339 in Verra (VCS)#1of 10 in AMS-I.B
Audit Analysis
A VCS-registered solar irrigation project (AMS-I.B) with VVB-verified additionality and a clean validation record (all 17 CARs closed, no outstanding findings). However, the absence of any monitoring or verification data for a project running since January 2022, a 0% leakage deduction justified only as 'deemed negligible,' and the lack of a stated buffer pool or FPIC documentation limit confidence in the project's long-term integrity and transparency.
Red Flags
- No verification or monitoring report found in the extracted record despite the project having been registered since January 2022; total verified ERR is not stated
- Leakage deduction of 0% justified solely as 'deemed negligible' without a quantified analysis, which is a weak basis for an irrigation project where displaced diesel use could shift to other farm operations
- FPIC (Free, Prior and Informed Consent) is not stated in the extracted record despite the project serving smallholder farmers
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified combined test
N/A claim for non-AFOLU
0% deduction, 'deemed negligible' only
Project-specific; no reassessment date stated
Grievance & benefit sharing present; FPIC not stated
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →