Solar Water Heater Program In India-CPA-3
GS-827 ↗ · current registry ID: GS4614
#865of 975 in India#1582of 1801 in Gold Standard (GS)#76of 115 in AMS-I.C
Audit Analysis
This Gold Standard solar water heater project (CPA-3) in India presents a mixed picture: it has a valid combined additionality test, FPIC, and a grievance mechanism, but the 2025 verification report indicates additionality was not confirmed by the VVB, the verified usage rate has dropped sharply from 82.6% to 53.8%, and dozens of corrective actions across multiple verification cycles reveal systemic data-quality problems. The absence of a buffer pool, a 0% leakage deduction with inconsistent justification across documents, and a low extraction confidence level further erode confidence in the integrity and reliability of the claimed emissions reductions.
Red Flags
- The 2025 verification report states additionality was NOT verified by the VVB, contradicting the 2024 verification report which confirmed it — a fundamental additionality gap in the most recent cycle.
- Verified usage rate dropped from 82.58% (2024 monitoring period) to 53.83% (2025 monitoring period), a 35% relative decline that raises questions about system reliability and the durability of claimed reductions.
- Dozens of corrective actions (CARs) across multiple verification cycles flag inconsistencies in ER calculations, grid emission factors, surface areas, sampling results, and data mismatches between survey forms, databases, and ER sheets.
- Crediting period is stated as 2020–2025 in the monitoring report but 2013–2033 in the 2025 validation report — a 20-year vs 5-year discrepancy that undermines confidence in the project's temporal boundaries.
- No buffer pool is documented, leaving no financial backstop against potential reversal of avoided emissions.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 26,978 | 0 | 26,978 | |
| 2016 | 31,207 | 0 | 31,207 | |
| 2017 | 7,159 | 0 | 7,159 | |
| 2021 | 26,873 | 26,873 | 0 | |
| 2022 | 21,296 | 3,300 | 17,996 | |
| 2023 | 7,288 | 0 | 7,288 | |
| Total | 120,801 | 30,173 | 90,628 |
Risk Indicators
Combined test present but not VVB-confirmed in 2025 cycle
mixed evidence / unresolved risk
0% deduction, justification inconsistent across cycles
Project-specific baseline, reassessed 2025, method disputed across docs
FPIC conducted, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →