Solar Water Heater Program in India-CPA-6

GS-1105 ↗ · current registry ID: GS6356

#866of 975 in India#1583of 1801 in Gold Standard (GS)#77of 115 in AMS-I.C

4.1/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.0
Documentation
3.5

Audit Analysis

The Solar Water Heater Program in India (CPA-6) has VVB-confirmed additionality and recent baseline reassessment, but suffers from a significant gap between assumed and verified usage rates (280 vs 82.05), an unaddressed leakage justification, no stated buffer pool, and multiple data contradictions across documents. The low extraction confidence and absence of a verified ERR figure for the current monitoring period further undermine confidence in the project's credit claims.

Red Flags

  • Usage rate assumed at 280 in the ex-ante phase but verified at only 82.05 in the 2025 monitoring report — actual usage is roughly 29% of the assumed value, raising serious over-crediting risk
  • Leakage deduction is 0% and the most recent verification report (2025) records the justification as 'not addressed', while the 2020 report stated it was 'deemed negligible' — the contradiction and lack of a current justification is a compliance gap
  • No buffer pool percentage is stated in any available document, and reversal events are recorded as 'not addressed', leaving permanence risk unquantified
  • The crediting period is contradictory: the 2020 verification report states 2013-02-01 to 2020-01-31, while the 2025 monitoring report states 2018-12-22 to 2024-12-24 — it is unclear whether the project was renewed or the dates are in error
  • Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, which undermines the reliability of all extracted figures

Credit Vintages

IssuedRetiredAvailable
2019
12,862012,862
2020
8,40008,400
2021
32,35332,3530
2022
37,872037,872
2023
9,3389,3380
Total100,82541,69159,134

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversals not addressed

Leakage

0% deduction; justification 'not addressed' in 2025 VR

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06AMS-I.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents