Skip to main content
GSEnergy Efficiency - DomesticZimbabweGeneral Methodologyv2.1

Southern Africa Clean Cookstove Initiative (SACCI) PoA: VPA01 in Zimbabwe

GS-4595 ↗ · current registry ID: GS12875

#281of 1329 in Industrial#2of 9 in Zimbabwe#463of 1801 in Gold Standard (GS)

5.4/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
5.0

Audit Analysis

The SACCI Zimbabwe cookstove project has a solid additionality assessment confirmed by the VVB and a conservative usage-rate assumption, but suffers from a notable absence of a buffer pool and unaddressed reversal risk for a project type where cookstove replacement is a realistic threat. Multiple contradictions across the PDD, monitoring report, and verification report—particularly on leakage deduction, safeguards documentation, and the ex-ante ERR figure—undermine confidence in the internal consistency of the project's claims.

Red Flags

  • No buffer pool is stated in any available document, and reversal events are explicitly 'not addressed'—a significant gap for a cookstove project where units can be replaced with traditional stoves within the 5-year crediting period.
  • Eight contradictions exist across project documents, including a 5× discrepancy in the leakage deduction (0.95% in the PDD vs 5% in the monitoring report) and conflicting statements on whether safeguards were documented (verification report says yes, monitoring report says no).
  • The total ex-ante lifetime ERR is inconsistent: the PDD (2022) states ~1.03 million tCO₂e while an undated, unidentified document states ~1.45 million tCO₂e, and the source of the latter cannot be verified.
  • The verification report (Aug 2025) records the leakage justification as 'not addressed' while the monitoring report (Jul 2025) records it as 'quantified'—a direct conflict on a material MRV element.

Credit Vintages

IssuedRetiredAvailable
2022
128,9640128,964
2023
250,3820250,382
2024
41,158041,158
Total420,5040420,504

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

reversals unaddressed

Leakage

5% applied but justification contradictory

Baseline

Project-specific; reassessment date unstated

Safeguards

FPIC & grievance present; docs conflict

Double-claim

CORSIA & CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents