SPI Wildfire Reforestation Project #1
#20of 38 in ARR (afforestation)#74of 115 in United States#13of 32 in Climate Action Reserve (CAR)
Audit Analysis
The project exhibits significant evidence gaps across additionality, permanence, and MRV transparency. While no material findings or contradictions were reported, the absence of verified credit volumes, verifier details, and eligibility statuses prevents a robust quality assessment.
Red Flags
- Missing additionality test documentation and independent verification confirmation
- Unverified emission reduction volumes and outdated monitoring data (2015–2016)
- Unclear CORSIA and cap-and-trade eligibility status leaving double-claiming risk unaddressed
- Leakage not addressed in project documentation
- Buffer pool size not disclosed in available documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
No additionality assessment found
Buffer pool absent and reversal risk unaddressed
Leakage not addressed in available records
Project-specific baseline without recent reassessment
No safeguards or grievance mechanisms documented
CORSIA and CCP eligibility status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →