Skip to main content
CFCUrban Forest CarbonUnited StatesGeneral Methodologyv2.1

St Paul Minnesota Forest Carbon Offsets

CFC-st-paul-minnesota-forest-carbo ↗

#54of 389 in United States#24of 59 in City Forest Credits (CFC)

6.2/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.0
Documentation
6.0

Audit Analysis

A small-scale urban forest carbon project (250 hybrid elm trees) in St. Paul, MN, with a verified combined additionality test, jurisdictional baseline, and 5% buffer pool. The project is very new (planting 2022–2023) and delivered roughly 87% of the pro-rata ex-ante expectation for the first monitoring period, which is reasonable for young trees. Key gaps include the absence of any leakage treatment or justification and a crediting-period discrepancy between the validation and verification reports.

Red Flags

  • Leakage deduction and justification are entirely absent from the extracted record for a project type where tree removal or land-use change could release stored carbon
  • Crediting period differs between the validation report (2024-05-11 to 2050-05-11, 6 years) and the verification report (2020-11-24 to 2046-11-16, 26 years), creating ambiguity about the actual commitment horizon
  • One of the five source documents is classified as 'unknown' type, reducing confidence in the completeness of the evidence base

Credit Vintages

IssuedRetiredAvailable
2024
2,9762,95818
Total2,9762,95818

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

No deduction or justification found

Baseline

Jurisdictional baseline, project new

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents