Starsight Energy - Rooftop Solar PV and Efficient Air Conditioners
#889of 1935 in Renewable energy#8of 79 in Nigeria#556of 1339 in Verra (VCS)#14of 44 in AMS-I.F
Audit Analysis
Starsight Energy's rooftop solar PV and AC efficiency project in Nigeria is registered under VCS with a combined additionality test confirmed by the VVB, but suffers from significant documentation inconsistencies, a project-specific baseline, and a massive gap between the ex-ante estimate (356,569 tCO₂) and the verified monitoring-period result (4,142 tCO₂), representing only ~2.7% of the pro-rata expectation. The project is under-delivering, which is conservative for claim safety, but the material findings—including neglected AC efficiency gains, unavailable historical data, and unimplemented scrapping monitoring—raise questions about operational robustness.
Red Flags
- Verified ERR of 4,142 tCO₂ is only ~2.7% of the pro-rata expectation (~152,672 tCO₂) derived from the validation report's ex-ante estimate of 356,569 tCO₂ over the 7-year crediting period, indicating severe under-delivery or an overly optimistic ex-ante baseline
- Five direct contradictions between documents (FPIC status, additionality test type, ERR figures, benefit sharing, leakage justification) undermine data reliability
- Material finding: efficiency gains from AC replacement were deliberately neglected from the ER calculation for 'simplification', and independent monitoring of equipment scrapping could not be implemented
- Eight open corrective actions at the time of the 2024 verification report, including vague project descriptions and incorrect geodetic coordinates
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deduction, contradictory justifications
Project-specific, no reassessment date
FPIC and grievance mechanism present but contradicted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →