Skip to main content
GSOtherChinaACM0001

*Suzhou Qizi Mountain Landfill Gas Recovery Project (300259)

GS-1643 ↗ · current registry ID: GS397

#94of 189 in Methane#781of 1084 in China#1130of 1801 in Gold Standard (GS)#87of 159 in ACM0001

4.7/ 10
Integrity
4.8
Transparency
5.0
Claim Safety
4.0
Documentation
5.0

Audit Analysis

The Suzhou Qizi Mountain Landfill Gas Recovery Project has a confirmed additionality assessment and a named VVB, but is undermined by three corrective action requests (meter calibration error, non-ideal ER calculation method, and inconsistent emission values), a 0% leakage deduction with contradictory justification, and no buffer pool or reversal-risk treatment. CCP approval introduces dual-channel risk, and several key MRV parameters (FNRB method, usage monitoring, CORSIA eligibility) are absent from the extracted record.

Red Flags

  • Three Corrective Action Requests raised by the VVB: meter FD21246A calibration mismatch, ER calculation not based on directly monitored LFG parameters, and emission reduction values inconsistent with the calculation spreadsheet
  • Leakage deduction of 0% with justification described as 'not addressed' in the verification report, contradicting the validation report's 'deemed negligible' claim
  • Reversal events explicitly 'not addressed' and no buffer pool percentage stated, leaving permanence risk unquantified for a landfill gas project
  • CCP status is 'approved', creating dual-channel risk with China's domestic carbon market while CORSIA eligibility is not stated
  • FPIC recorded as not conducted in the validation report (2021), contradicting a 2017 appendix that records it as conducted

Credit Vintages

IssuedRetiredAvailable
2007
63,96362,9291,034
2008
85,34173,61411,727
2009
97,70797,7061
2010
123,454120,8802,574
2011
106,63796,9919,646
2012
84,47784,4770
2013
96,03996,0390
2014
129,224122,3376,887
2015
104,000104,0000
2016
120,694110,69410,000
2017
112,075107,0755,000
2018
144,201144,2010
2019
135,32893,07842,250
2020
133,714117,94715,767
2021
46,18646,1860
2022
5,2585,2580
Total1,588,2981,483,412104,886

Risk Indicators

Additionality

VVB-confirmed investment/combined test; capture not legally required

Permanence

reversal events not addressed

Leakage

0% deduction; justification contradictory across documents

Baseline

Project-specific, modeled; reassessed at 2021 validation

Safeguards

Grievance mechanism and benefit sharing present; FPIC not conducted per validation report

Double-claim

CCP approved; CORSIA eligibility not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents