GS Other China Documentazione completa General Methodology v2.0

*Suzhou Qizi Mountain Landfill Gas Recovery Project (300259)

GS-1643 ↗

6.0 / 10
Integrity
6.1
Transparency
6.0
Claim Safety
5.8
Documentation
6.4

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using a combined test in the verification report.

missing The verification report notes several CARs/CLs and says the ER method is conservative but not ideal because it is not based on directly monitored LFG parameters.

Transparency

verified The monitoring period, verifier name, verified ER volume, and Gold Standard registry information are stated in the verification report.

missing The extracted record does not state the leakage deduction, usage monitoring method, or total claimed ERs, limiting traceability.

Claim Safety

verified The project is CCP approved, which supports stronger market credibility.

missing Leakage is marked as not addressed, and the baseline is project-specific rather than a clearly standardized or jurisdictionally reassessed baseline.

Documentation

verified Multiple document types were used, including the PDD, verification report, monitoring report, and appendix, with medium extraction confidence.

missing The verification report contains several corrective actions and a calibration discrepancy that had to be corrected in a revised monitoring report.

Detailed Analysis

Integrity

The verification report confirms additionality through a combined test and names LGAI Technological Center, S.A. as the verifier, which supports the project’s core integrity. At the same time, the report lists multiple CARs and CLs, and it explicitly says the ER calculation method is conservative but not ideal because it is not based on directly monitored LFG parameters. Leakage is not addressed in the extracted facts, and reversal treatment is also not clearly documented.

Transparency

The documentation identifies the monitoring period, the verified emissions reductions of 317,242, the registry, and the verifier, which is helpful for traceability. However, key MRV details are missing from the extracted record, including the leakage deduction, usage monitoring method, and claimed ER total. The medium extraction confidence also suggests the record is usable but not fully complete.

Claim Safety

Claim safety is helped by CCP approval and by the fact that the project is a landfill gas recovery activity, which is generally easier to justify than many nature-based credit types. Still, the baseline is project-specific, leakage is not addressed, and the record does not show a quantified leakage deduction or a clearly documented usage-rate check. Those gaps increase over-crediting and greenwashing risk.

Documentation

The record draws on 23 extracted items across several document types, including the verification report, PDD, monitoring report, and appendix, which is a reasonable documentation base. The verifier is independent and the report is recent, but the extraction confidence is only medium and the report contains several corrective actions, including a meter calibration correction. That lowers confidence in the completeness and cleanliness of the documentation trail.

Overall

The project looks moderately credible overall, but not top-tier because the verification report contains multiple corrective actions and a conservative calculation approach that is acknowledged as not ideal. I privileged the 2023 verification report over the older 2013 report for the crediting-period contradiction because it is more recent and therefore more relevant to the current assessment; the older period appears to reflect an earlier issuance cycle rather than the current status. I also privileged the verification report’s statement that benefit sharing is described over the older PDD contradiction because the verification report is later and more specific to the reviewed monitoring period. These contradictions reduce reliability somewhat, but they do not by themselves overturn the main positive signals.

Audit Analysis

This landfill gas recovery project has some strong quality signals, including VVB-confirmed additionality, a named verifier, and CCP approval. However, the verification report also shows multiple corrective actions and a conservative but not ideal emissions calculation approach, while leakage and reversal treatment are not clearly addressed in the extracted record.

Project Description

Developer: South Pole Ltd Type: Other Size: Large Scale Methodology: ACM0001 Flaring or use of landfill gas Crediting period: 2007-04-22 → 2028-04-21 Estimated annual credits: 105170 tCO2e SDGs: Goal 4: Quality Education, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy, Goal 3: Good Health and Well-Being

Red Flags

  • The verification report records multiple corrective actions and clarifications, including meter calibration issues and a request for future ER calculations using credible monitored data.
  • Leakage and reversal treatment are not clearly documented in the extracted facts, and the project relies on a project-specific baseline rather than a recently reassessed standardized baseline.

Credit Vintages

Issued Retired Available
2007
63,963 62,929 1,034
2008
85,341 73,614 11,727
2009
97,707 97,706 1
2010
123,454 120,880 2,574
2011
106,637 96,991 9,646
2012
84,477 84,477 0
2013
96,039 96,039 0
2014
129,224 122,337 6,887
2015
104,000 104,000 0
2016
120,694 110,694 10,000
2017
112,075 107,075 5,000
2018
144,201 144,201 0
2019
135,328 93,078 42,250
2020
133,714 117,947 15,767
2021
46,186 46,186 0
2022
5,258 5,258 0
Total 1,588,298 1,483,412 104,886

Cosa migliorerebbe questo punteggio

  • Provide a clear leakage assessment with a quantified deduction or a documented justification for why leakage is negligible.
  • Publish a fuller MRV package showing the usage monitoring method, claimed versus verified ERs, and the basis for the emissions calculation using directly monitored data.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No reversal treatment stated

Leakage

Leakage not addressed

Baseline

Project-specific baseline

Safeguards

FPIC and grievance mechanism present

Double-claim

CCP approved; CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-10 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti