Taibus Banner Touzhijian 49.5MW Wind Power Project
GS-416 ↗ · current registry ID: GS2553
#193of 1935 in Renewable energy#63of 1084 in China#69of 1801 in Gold Standard (GS)#138of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Inner Mongolia, China, verified under Gold Standard with a VVB-confirmed investment additionality test and a standard grid-emission-factor baseline. The project shows no reversal risk and a conservative ex-ante estimate (verified output exceeded pro-rata expectation by ~26%), but six material findings, two outstanding corrective actions, and the absence of FPIC temper the overall assessment.
Red Flags
- Six material findings in the 2017 verification report, including incomplete metering calibration documentation (CR#1, CR#2) and an unresolved project start-date inconsistency between PDD v01 and the registered GS-VER-PDD
- Free, Prior and Informed Consent (FPIC) was not conducted, despite the project being in a pastoral region of Inner Mongolia
- Two corrective actions remain open: provision of power-meter calibration reports and further evidence for SDG indicator monitoring
- Contradiction in baseline method: the 2017 verification report labels it 'project' while the 2016 monitoring report labels it 'jurisdictional' — the grid-EF approach (jurisdictional) is the methodologically correct one for ACM0002
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 48,725 | 48,725 | 0 | |
| 2013 | 106,041 | 106,041 | 0 | |
| 2014 | 100,892 | 100,892 | 0 | |
| 2015 | 96,119 | 96,119 | 0 | |
| 2016 | 113,760 | 113,760 | 0 | |
| 2017 | 7,230 | 3,742 | 3,488 | |
| Total | 472,767 | 469,279 | 3,488 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% with quantified justification (appropriate for wind)
Grid EF 2017; method label inconsistent across docs
Grievance & benefit-sharing present; FPIC not conducted
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →