Vai al contenuto principale
avoidance Tennessee Documentazione completa General Methodology v2.0

Take a Hike

CE-take-a-hike-tn

6.0 / 10
Integrity
6.2
Transparency
5.4
Claim Safety
5.8
Documentation
7.1

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB and no reversals were reported for the monitoring period (validation/monitoring documentation).

missing Leakage treatment is inconsistent across documents (0.4% vs 40%), and baseline reassessment timing is not stated in the extracted record.

Transparency

verified VVB is identified (Aster Global Environmental Solutions, Inc) and the monitoring period is clearly stated (2018-12-06 to 2019-12-05).

missing Total emission reductions claimed and verified are not found in the extracted record, and key MRV cross-checks are therefore limited.

Claim Safety

verified The project is stated as not CORSIA-eligible, reducing dual-claim channel risk.

missing Over-crediting risk is elevated by the unresolved leakage discrepancy (0.4% vs 40%) and conflicting safeguard disclosures.

Documentation

verified Multiple core documents are present (PDD, monitoring report, validation report) and extraction confidence is high.

missing Contradictions across documents on several key fields (leakage, FPIC, grievance mechanism, safeguards) indicate documentation reliability issues.

Detailed Analysis

Integrity

The validation documentation indicates additionality was confirmed by the VVB using a barrier-type assessment, supporting additionality robustness. The monitoring report (2019) states there were no intentional or unintentional reversals during the reporting period and the project contributes 18% to the buffer pool, which supports permanence risk management. Integrity is weakened by a major inconsistency in leakage: the monitoring report quantifies leakage at 0.4%, while the validation report (2020-05-06) indicates 40%, and the baseline is project-specific with no baseline reassessment timing found in the extracted record.

Transparency

The monitoring period is clearly specified (2018-12-06—2019-12-05) and the VVB is named (Aster Global Environmental Solutions, Inc), which supports traceability. However, the extracted record does not include total emission reductions claimed or verified, limiting the ability to reconcile issuance quantities to monitoring results. Conflicting statements across documents on safeguards-related items also reduce transparency because readers cannot easily determine which commitments actually apply.

Claim Safety

The project is explicitly stated as not CORSIA-eligible, which reduces the risk of claims being made simultaneously into CORSIA-related channels. Claim safety is nevertheless constrained by potential over-crediting risk from the unresolved leakage discrepancy (0.4% in the monitoring report versus 40% in the validation report), which could materially change net credited reductions. In addition, conflicting disclosures on FPIC, safeguards, and grievance mechanisms increase reputational and stakeholder-risk for downstream claims.

Documentation

The extracted record includes a PDD, monitoring report, and validation report, with high extraction confidence and no material findings or corrective actions reported, which supports documentation completeness. Still, multiple contradictions across documents (FPIC, benefit sharing, safeguards mention, grievance mechanism, leakage percentage, and how reversals are addressed) indicate internal inconsistency that reduces confidence in the documentary record. The crediting period is long (2018-06-05—2038-06-04) while the monitoring evidence shown is for an early one-year period, so ongoing documentation quality will matter for future periods.

Overall

Key contradictions materially affect quality interpretation. For leakage, the monitoring report (2019) provides a specific quantified deduction of 0.4%, while the validation report (2020-05-06) states 40%; because the validation report is later and specifically focused on methodological conformance, I privilege the 40% figure as the more conservative and likely quality-critical value, and I reduce integrity/claim-safety accordingly. For additionality test type, I privilege the validation report’s barrier test over the PDD’s “combined” description because the VVB’s assessment is the authoritative confirmation. For FPIC, benefit sharing, safeguards mention, and grievance mechanism, I privilege the monitoring report’s “not conducted/not described/not present” statements over the PDD’s “present” claims because monitoring reflects implemented practice; these inconsistencies drive a downward adjustment to transparency and documentation reliability.

Audit Analysis

This is an improved forest management project with VVB-confirmed additionality and an 18% buffer contribution, and no reversals reported for the monitoring period. However, several internal inconsistencies across documents—especially the leakage deduction (0.4% vs 40%) and safeguards/FPIC/grievance statements—reduce confidence in the reliability of key quality claims.

Project Description

Why we chose this project: “This area is a high priority for conservation because of the development pressure and value of the hardwood timber in the area. This area also has historic significance and research value.” The forest restoration practices are tailored to suit the trees and habitats to not only maximize carbon sequestration

Red Flags

  • Major discrepancy in leakage deduction between the monitoring report (0.4%) and the validation report (40%), which can materially affect credited ERs
  • Safeguards-related statements conflict across documents (FPIC, grievance mechanism, and whether safeguards are mentioned), increasing social-risk and reputational risk
  • Baseline is project-specific and the timing of any baseline reassessment is not stated in the extracted record
  • Total ERs claimed and verified are not found in the extracted record, limiting independent reasonableness checks

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Resolve and document the leakage deduction discrepancy (0.4% vs 40%) with a clear calculation trail and reconcile net ERs/issuance accordingly.
  • Publish consistent, auditable safeguards evidence (FPIC records where applicable, benefit-sharing description, and a functioning grievance mechanism) and ensure alignment across the PDD, validation, and monitoring reports.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality test

Permanence

Buffer pool (18%) and no reversals reported

Leakage

Quantified but conflicting leakage deduction

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

Safeguards/FPIC/grievance inconsistently documented

Double-claim

Not CORSIA-eligible

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti