Skip to main content
VCSAgriculture Forestry and Other Land UseIndiaAR-ACM0003

Tasar Forest Carbon Project

VCS-4708 ↗

#112of 261 in Soil carbon#620of 975 in India#818of 1339 in Verra (VCS)#41of 97 in AR-ACM0003

4.9/ 10
Integrity
5.2
Transparency
5.0
Claim Safety
4.8
Documentation
4.2

Audit Analysis

The Tasar Forest Carbon Project (VCS-4708) is a VCS ALF soil-carbon project in India with a VVB-confirmed combined additionality test and a 20% buffer pool, but it carries significant quality concerns: a zero-leakage assumption flagged as insufficiently evidenced, a project-specific baseline, 11 material findings requiring corrective action, and a 57% reduction in the claimed ERR between PDD revisions. The low extraction confidence and an 'unknown' document type further weaken the evidentiary base.

Red Flags

  • Zero leakage deduction justified only as 'deemed negligible,' yet the validation report's material findings explicitly cite 'insufficient evidence for the zero leakage assumption' — a material gap for a forest/soil-carbon project in a region with active biomass removal (silkworms, firewood).
  • The claimed ERR was reduced by approximately 57% between the October 2023 PDD (1,143,566 tCO₂e) and the March 2026 PDD (498,985 tCO₂e), indicating the initial project boundary and credit estimate were substantially over-stated before correction.
  • Eleven corrective actions were required during validation, spanning KML boundary errors, baseline description inconsistencies, unclear non-permanence risk scores, missing additionality elements, and insufficient ownership evidence — suggesting the initial submission was materially deficient.
  • The reversal-events field is contradictory: the validation report states non-permanence is 'not addressed,' while a same-date appendix references reversal events as 'reported.' This ambiguity undermines confidence in the permanence risk assessment.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

20% buffer pool but reversal-event status contradictory

Leakage

0% deduction, 'deemed negligible' but evidence insufficient

Baseline

Project-specific baseline; reassessment not yet due

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AR-ACM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents