Terminal Road Sustainable Wetlands and Mangrove Conservation (Tr-SWAM)
#6of 11 in Blue carbon#5of 7 in SA#82of 154 in Intl. Carbon Registry (ICR)#6of 14 in AR-AM0014
Audit Analysis
A pre-operational mangrove conservation project (crediting starts 2028) registered in the Indian Carbon Registry with a 10% buffer pool and VVB-confirmed additionality, but hampered by a project-specific baseline, unresolved FPIC contradiction, 30 material findings at validation, and a low-confidence extraction record. The ERR figures (29,238 lifetime vs 975 per-year) are internally consistent but poorly labelled, and no monitoring data exists yet. Overall a moderate-risk project with meaningful documentation gaps that must be closed before first issuance.
Red Flags
- FPIC contradiction: the PDD (2025-03-10) states FPIC was conducted, but the validation report (2025-03-12) records it as not conducted; the VVB's assessment is privileged, leaving a safeguards gap for a community-facing conservation project
- Reversal events recorded as 'not_addressed' in the validation report, despite a 10% buffer pool being applied; the PDD's 'none_reported' is less conservative and was not privileged
- 30 material findings (7 CARs, 23 CLs) and 18 corrective actions at validation, including missing financial additionality calculation, missing CO2 removal data, and missing stakeholder engagement details
- Low extraction confidence across the document set, meaning at least one key document was poorly readable and some facts may be incomplete
- 0% leakage deduction for a blue-carbon mangrove project, justified as 'quantified' in the 2025 validation but 'not_addressed' in the 2024 version
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2029 | 83 | 0 | 83 | |
| 2030 | 166 | 0 | 166 | |
| 2031 | 280 | 0 | 280 | |
| 2032 | 336 | 0 | 336 | |
| 2033 | 392 | 0 | 392 | |
| 2034 | 448 | 0 | 448 | |
| 2035 | 504 | 0 | 504 | |
| 2036 | 560 | 0 | 560 | |
| 2037 | 616 | 0 | 616 | |
| 2038 | 672 | 0 | 672 | |
| 2039 | 728 | 0 | 728 | |
| 2040 | 784 | 0 | 784 | |
| 2041 | 840 | 0 | 840 | |
| 2042 | 896 | 0 | 896 | |
| 2043 | 951 | 0 | 951 | |
| 2044 | 1,007 | 0 | 1,007 | |
| 2045 | 1,063 | 0 | 1,063 | |
| 2046 | 1,119 | 0 | 1,119 | |
| 2047 | 1,175 | 0 | 1,175 | |
| 2048 | 1,231 | 0 | 1,231 | |
| 2049 | 1,287 | 0 | 1,287 | |
| 2050 | 1,343 | 0 | 1,343 | |
| 2051 | 1,399 | 0 | 1,399 | |
| 2052 | 1,455 | 0 | 1,455 | |
| 2053 | 1,511 | 0 | 1,511 | |
| 2054 | 1,568 | 0 | 1,568 | |
| 2055 | 1,622 | 0 | 1,622 | |
| 2056 | 1,678 | 0 | 1,678 | |
| 2057 | 1,734 | 0 | 1,734 | |
| 2058 | 1,790 | 0 | 1,790 | |
| Total | 29,238 | 0 | 29,238 |
Risk Indicators
VVB-confirmed combined test
Buffer present but reversals not addressed
0% deduction, quantified but thin
Project-specific, reassessment not stated
Grievance present, FPIC unconfirmed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →