TerraClear Ceramic Water Purifier Project in Lao PDR

GS-323 ↗ · current registry ID: GS2095

#1088of 1329 in Industrial#1536of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.0
Documentation
3.5

Audit Analysis

The TerraClear Ceramic Water Purifier project in Lao PDR has a verified additionality assessment and no reversal events, but is undermined by an extensive list of corrective actions, an expired environmental compliance certificate (since 2013), a significant gap between assumed (100%) and verified (76%) usage rates, and a 42% discrepancy between claimed and verified emission reductions. The project-specific baseline and absence of a stated buffer pool further weaken the integrity profile. Documentation, while voluminous (28 documents), is of poor quality with numerous data errors and unresolved findings.

Red Flags

  • Environmental Compliance Certificate expired since December 2013 with renewal process unclear due to regulatory changes (verification report, 2025)
  • Usage rate assumed at 100% in the PDD but verified at only 76.19% in the 2023 verification report — a 24-percentage-point over-claim
  • Claimed emission reductions of 149,706 tCO2e (verification report, 2025) exceed the VVB-verified figure of 105,000 tCO2e by approximately 42%
  • FPIC contradiction: the PDD (2020) states FPIC was conducted, but the 2023 verification report records it as not conducted
  • Workers employed more than three months without contracts found during site visit; some using personal masks instead of company-provided PPE

Credit Vintages

IssuedRetiredAvailable
2012
3433430
2013
3,9473,9470
2014
8,3808,3800
2015
16,07116,0710
2016
26,97426,93935
2017
39,90434,3115,593
2018
50,87750,8770
2019
72,88167,2305,651
2020
60,00020,32139,679
2021
60,00045,30514,695
2022
60,000060,000
2023
60,000060,000
2024
60,000060,000
2025
15,000015,000
Total534,377273,724260,653

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction applied

Baseline

Project-specific baseline, reassessed 2021

Safeguards

Grievance mechanism present; FPIC not conducted per VVB; compliance certificate expired

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents