The Breathing Space Improved Cooking Stoves Programme, India - VPA No. 02 Envirofit
GS-26 ↗ · current registry ID: GS1029
#802of 1329 in Industrial#706of 975 in India#1198of 1801 in Gold Standard (GS)#127of 189 in AMS-II.G
Audit Analysis
The Breathing Space improved cookstove project in India has a verified additionality test and a quantified 5% leakage deduction, but is undermined by an extensive list of over 30 material findings, 17 corrective actions, and multiple cross-document contradictions on key parameters such as the fNRB value, additionality test type, and FPIC status. The project-specific baseline, unaddressed reversal risk, and absence of a buffer pool leave meaningful integrity gaps. Despite these concerns, the project delivered roughly 300% of its pro-rata ex-ante expectation for the monitored period, indicating no over-crediting risk.
Red Flags
- Over 30 material findings and 17 corrective actions raised across the PoA-DD, VPA-DDs, and GS Passport, indicating systemic documentation and calculation weaknesses in the project's reporting
- Reversal events are explicitly 'not addressed' in the verification report and no buffer pool percentage is stated, leaving permanence risk unquantified for a cookstove project where stove failure or reversion to traditional stoves is a realistic risk
- The monitoring report template was altered by the project proponent (flagged as a material finding), raising concerns about the integrity of the MRV process
- FPIC status is contradictory: the PDD (2011) states FPIC was conducted, while a 2017 appendix states it was not, with no reconciliation in the verification report
- The fNRB value shows a unit or method inconsistency across documents (0.9115 in the verification report vs 90.5 in the PDD), and a material finding notes the country average was used instead of the required state-specific value
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 21,734 | 21,734 | 0 | |
| 2011 | 45,039 | 45,039 | 0 | |
| 2012 | 31,618 | 31,618 | 0 | |
| 2013 | 5,416 | 5,416 | 0 | |
| 2014 | 4,231 | 4,231 | 0 | |
| 2015 | 574 | 574 | 0 | |
| Total | 108,612 | 108,612 | 0 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, reassessment date not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →