The Bridgestone Chestnut Mountain Carbon Project
#26of 28 in Water#59of 115 in United States#9of 45 in American Carbon Registry (ACR)
Audit Analysis
The project demonstrates a structured design with quantified leakage and an investment additionality test, but lacks verified monitoring data and independent VVB confirmation. High projected reversal risk and sparse documentation significantly limit confidence in long-term credit validity.
Red Flags
- High projected reversal risk of 19.2% without confirmed buffer pool contribution
- Missing verification reports and monitoring periods limit operational transparency
- Low extraction confidence indicates poor source document quality
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test present but unverified
Reversal risk reported
Quantified deduction
Project-specific baseline
No safeguards documented
Eligibility status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →