The Giving Trees
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB (validation/verification record) using an investment test.
missing Baseline is project-specific and the baseline reassessment timing and leakage treatment are not evidenced in the extracted record (monitoring/validation set).
Transparency
verified Independent VVB is identified (SGS United Kingdom Ltd) and a defined monitoring period is provided (2006-04-01—2007-10-20).
missing Claimed ERs are not found in the extracted record and key MRV parameters (e.g., grid EF vintage year) are not stated, limiting reproducibility.
Claim Safety
verified The project is stated as not CORSIA-eligible, reducing one pathway for double-claiming concerns.
missing Over-crediting risk is elevated because leakage is not addressed and core inputs/periodization are inconsistent across documents.
Documentation
verified Multiple core documents are available (PDD, validation report, monitoring report) with high extraction confidence.
missing Corrective actions were required (DNA approval letter; stakeholder clarification), indicating documentation/eligibility gaps at the time of review.
Detailed Analysis
Integrity
The validation/verification record indicates additionality was confirmed by the VVB using an investment test, which supports additionality robustness. However, the baseline is project-specific and no baseline reassessment date is found in the extracted record, which weakens confidence in baseline validity over time. Leakage is explicitly not addressed in the monitoring/validation set and no leakage deduction is stated, creating an integrity gap even if leakage is expected to be low for wind projects.
Transparency
The monitoring period is clearly stated (2006-04-01—2007-10-20) and the VVB is named (SGS United Kingdom Ltd), which supports traceability. However, the total claimed ERs are not found in the extracted record, preventing a claimed-versus-verified cross-check. Key MRV details such as the grid emission factor vintage year are not stated, reducing the ability for third parties to reproduce calculations.
Claim Safety
The project is stated as not CORSIA-eligible, which lowers the risk of dual-channel claims through CORSIA. Nonetheless, claim safety is weakened by the lack of leakage treatment and by inconsistencies across documents that could affect the interpretation of what was credited and for which period. CCP status is not stated in the extracted record, so buyers cannot rely on an external quality label to reduce greenwashing risk.
Documentation
The extracted record includes a PDD, validation report, and monitoring report, and the extraction confidence is high, supporting a moderate documentation score. However, the review process listed corrective actions requiring a host country approval letter and clarification of which government departments were considered local stakeholders, indicating incomplete or unclear documentation at the time. Safeguards-related elements (FPIC and grievance mechanism) are not evidenced, and benefit sharing is not described.
Overall
Three contradictions reduce confidence in the record. For safeguards, the monitoring report (2008-02-25) indicates safeguards were mentioned while the validation report (2008-02-28) indicates they were not; the validation report is privileged because it is the formal assessment document and slightly more recent, so safeguards are treated as weakly evidenced. For additionality test type, the validation report (2007-09-26) cites an investment test while the PDD (2007-09-18) cites a barrier test; the validation report is privileged because it reflects the VVB’s determination, but the inconsistency still lowers reliability. For the crediting period, the validation report (2008-02-28) aligns with the monitoring period (2006-04-01—2007-10-20) while the PDD lists 2007-08-01—2014-07-31; the validation/monitoring dates are privileged as they correspond to the verified period, but the discrepancy is a major red flag and pulls down overall scoring.
Audit Analysis
This is a wind power project with VVB-confirmed additionality, but key integrity elements are weakly evidenced in the extracted record. Leakage is not addressed, baseline is project-specific with no reassessment date found, and there are material inconsistencies across documents (including the crediting period). Overall, the project appears moderately documented but carries elevated over-crediting and reliability risk due to gaps and contradictions.
Project Description
Why we chose this project: “This project includes a robust GPS-based monitoring system to independently track the trees and report project progress online. This level of ‘absolute transparency’ into field operations ensures TIST is a project Cool Effect can confidently stand behind. The sale of carbon credits provides income and funding to address a
Red Flags
- Crediting period is contradictory between the PDD (2007-08-01—2014-07-31) and the validation/monitoring record (2006-04-01—2007-10-20), raising concerns about what period the verified ERs actually cover.
- Leakage is explicitly not addressed and no leakage deduction is stated, despite being a key accounting element that should be justified even if deemed negligible.
- Safeguards and stakeholder process documentation is inconsistent, and corrective actions request clarification of local stakeholders and a host country approval letter.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 9,074 | 9,074 | 0 | |
| 2007 | 12,630 | 12,630 | 0 | |
| Total | 21,704 | 21,704 | 0 |
Cosa migliorerebbe questo punteggio
- Publish/locate the ER calculation annex showing claimed vs verified ERs, grid emission factor vintage year, and any uncertainty/QA-QC checks for the monitoring period.
- Provide a clear leakage assessment (even if negligible) and reconcile the crediting period discrepancy across the PDD, validation report, and monitoring report with an explicit registry/issuance timeline.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Non-land-use project; reversal risk not material
Leakage not addressed; no deduction stated
Project-specific baseline; reassessment timing not evidenced
FPIC/grievance not evidenced; safeguards inconsistent
Not CORSIA-eligible; no CCP status stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →