Skip to main content
VCSAgriculture Forestry and Other Land UseBrazil Registry: RegisteredVM0015

The Serra do Amolar REDD+ Project

VCS-2566 ↗

#43of 261 in Soil carbon#43of 211 in Brazil#424of 1339 in Verra (VCS)#6of 29 in VM0015

5.5/ 10
Integrity
5.8
Transparency
5.5
Claim Safety
5.2
Documentation
5.2

Audit Analysis

The Serra do Amolar REDD+ project is a VCS-registered forest conservation project in Brazil with a VVB-verified combined additionality test, a 16% buffer pool, and a conservative 46.6% leakage deduction. However, significant contradictions between documents on lifetime emission reductions (2.84 million vs 644 thousand tCO2e) and leakage percentages (46.6% vs 19%), combined with a project-specific baseline and 40 resolved corrective actions, introduce meaningful data-reliability concerns. The project delivered roughly 69% of its pro-rata ex-ante expectation for the 4.5-year monitoring period, indicating moderate under-delivery.

Red Flags

  • Lifetime ex-ante emission reduction estimate differs by a factor of ~4.4 between the PDD (644,471 tCO2e, May 2021) and the verification report (2,837,764 tCO2e, Oct 2022), raising questions about the stability of the project's carbon accounting baseline.
  • Leakage deduction is reported as 46.6% in the monitoring report but 19% in the validation report — a 27.6-percentage-point gap that materially affects the net credit volume and undermines confidence in the leakage methodology.
  • The monitoring report (May 2022) references reversal events as 'reported' while the verification report (Oct 2022) states none were reported; the VVB's later assessment is privileged, but the discrepancy warrants scrutiny of the fire-risk mitigation claims.
  • 40 corrective action requests and 20 material findings were issued during verification, including corrections to project area, emission reduction estimates, and reference region data, indicating substantial initial documentation weaknesses.

Credit Vintages

IssuedRetiredAvailable
2016
10,27010,170100
2017
40,85040,8500
2018
110,56361,52649,037
2019
73,49865,2868,212
Total235,181177,83257,349

Risk Indicators

Additionality

VVB-verified combined test

Permanence

16% buffer, no reversals, but 2020 fire risk flagged

Leakage

46.6% quantified deduction (monitoring report)

Baseline

Project-specific; reassessment not yet due (10-yr VCS ALM rule)

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10VM0015

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents