Three Gorges New Energy Jiuquan Co., Ltd Guazhou 100MW Solar Power Project

VCS-1444 ↗

#634of 1935 in Renewable energy#305of 1084 in China#371of 1339 in Verra (VCS)#492of 1287 in ACM0002

5.6/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A 100 MW solar PV project under VCS methodology ACM0002 with a jurisdictional grid-emission-factor baseline and a VVB-confirmed combined additionality test. The project delivers close to its pro-rata expectation (≈99%), but the verification record contains multiple material findings, eight corrective actions, and several cross-document contradictions that erode confidence in data quality and documentation rigour.

Red Flags

  • The 2022 verification report applied a 2 % materiality threshold instead of the 5 % required for projects with ER ≤ 300,000 tCO₂e/yr, meaning some errors may have gone undetected.
  • Eleven material findings and eight corrective actions were raised across verification cycles, including inconsistent energy values between the monitoring report and meter records, and a calibration-validity gap in MR v01.
  • The crediting period is stated as 2013-2023 (10 yr) in the 2022 verification report but 2012-2032 (20 yr) in a 2015 document, creating ambiguity about the project's actual crediting window.
  • Leakage justification shifted from 'quantified' (2020 verification) to 'deemed negligible' (2022 verification) without a clear documented rationale for the change.
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable during data extraction.

Credit Vintages

IssuedRetiredAvailable
2014
105,953103,6922,261
2015
68,84066,9871,853
2016
49,94049,335605
2017
82,08782,0798
2018
90,81657,69633,120
2019
40,73740,7370
2020
85,39217,27368,119
2021
127,153101,83725,316
2022
84,39629,52854,868
Total735,314549,164186,150

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Not applicable – solar PV, no biogenic carbon

Leakage

0 % deduction, deemed negligible for solar

Baseline

Jurisdictional grid EF, reassessment date not stated

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents