Tongyi CMM Power Generation Project
#122of 189 in Methane#898of 1084 in China#1023of 1339 in Verra (VCS)#20of 35 in ACM0008
Audit Analysis
The Tongyi CMM Power Generation Project is a registered VCS renewable energy project with VVB-confirmed additionality and no inherent reversal risk, but it is undermined by a 10× discrepancy in lifetime ERR between the financial document and the validation report, a project-specific (non-jurisdictional) baseline, and eight material findings at validation (all resolved). Multiple contradictions across documents and low extraction confidence limit confidence in the data record.
Red Flags
- Lifetime ERR differs by a factor of 10 between the financial document (172,393 tCO₂e) and the validation report (1,723,930 tCO₂e); the validation report value is privileged as the authoritative VCS document, but the discrepancy is unexplained
- Validation report raised a material finding explicitly questioning whether this project type should be eligible in the carbon market
- Capture legally required is stated as true in one version of the validation report (2025-12-26) and false in the later version (2026-02-24), creating ambiguity about the regulatory additionality basis
- Low extraction confidence across the document set reduces reliability of all extracted figures
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
No storage; no reversal risk
0% deemed negligible; reasonable for power gen
Project-specific, modeled; not jurisdictional
FPIC and grievance present; stakeholder/land gaps flagged
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →