Top Third Ventures Stove Programme CPA KE0005 – BURN Efficient Cookstoves for Kenya supported by Republic of Korea
GS-3668 ↗ · current registry ID: GS11611
#401of 1329 in Industrial#48of 157 in Kenya#646of 1801 in Gold Standard (GS)#75of 189 in AMS-II.G
Audit Analysis
A Gold Standard cookstove efficiency project in Kenya with a VVB-confirmed investment additionality test and no reported reversals, but undermined by a large volume of material findings, 40+ corrective actions, and multiple cross-document contradictions in key parameters (ERR values, leakage, usage rates, fNRB method). The project over-delivers relative to its pro-rata ex-ante expectation, yet the absence of FPIC, an unstated buffer pool, and a project-specific baseline limit confidence in the integrity of the credit.
Red Flags
- Verified ERR dropped from 117,841 tCO₂e (2025 VR) to 74,357 tCO₂e (2026 VR) — a 37% reduction between consecutive verification cycles, indicating significant data instability
- FPIC was not conducted per the most recent verification report (2024), contradicting the 2023 validation report which stated it was done
- Usage rate assumed at 0.9 in the ex-ante estimate but verified at only 0.438 in the 2026 VR — a 51% shortfall that raises questions about the robustness of the ex-ante calculation
- 40+ corrective actions required across the verification cycle, including ER value inconsistencies, SDG calculation errors, and missing supporting evidence
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 33,293 | 0 | 33,293 | |
| 2022 | 32,485 | 12,886 | 19,599 | |
| 2023 | 26,870 | 26,333 | 537 | |
| 2024 | 14,759 | 0 | 14,759 | |
| Total | 107,407 | 39,219 | 68,188 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
5% quantified deduction (2026 VR)
Project-specific, reassessed 2025
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →