Skip to main content
GSEnergy Efficiency - DomesticKenyaAMS-II.G

Top Third Ventures Stove Programme CPA KE0006 – BURN Efficient Cookstoves for Kenya supported by Republic of Korea

GS-3669 ↗ · current registry ID: GS11612

#934of 1329 in Industrial#116of 157 in Kenya#1362of 1801 in Gold Standard (GS)#145of 189 in AMS-II.G

4.5/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

A Gold Standard cookstove energy-efficiency programme in Kenya with VVB-confirmed additionality and no reversal events, but undermined by an extensive list of 40+ corrective actions, nine material findings, a significant gap between assumed (90%) and verified (43.8%) stove usage rates, and multiple contradictions in key parameters across documents. The project over-delivered relative to its ex-ante estimate, which is a positive signal, but data reliability concerns and the absence of a buffer pool or confirmed FPIC process limit confidence in the integrity of the credit claim.

Red Flags

  • Usage rate assumed at 90% in the PDD but verified at only 43.8% in the 2026 verification report — a 51-percentage-point gap that undermines the ex-ante baseline assumptions
  • 40+ corrective actions required by the VVB, including ER value inconsistencies, SDG calculation errors, missing supporting evidence, and calibration delays
  • FPIC not conducted per the most recent verification report (2024), contradicting the earlier validation report (2023) which indicated it was done
  • Major ERR discrepancy: the monitoring report (Oct 2025) reports 117,841 tCO2e while the verification report (Aug 2026) verifies only 74,357 tCO2e — a 37% reduction that signals data reliability issues

Credit Vintages

IssuedRetiredAvailable
2021
33,789033,789
2022
32,96913,07819,891
2023
27,27126,727544
2024
14,979014,979
Total109,00839,80569,203

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

no reversals

Leakage

5% quantified deduction applied

Baseline

Project-specific; reassessed 2025

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06AMS-II.G – Energy efficiency measures in thermal applications of non-renewable biomass

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents