Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
Re-assessment pendingCDMWindBrazilRegistry: RegisteredACM0002

Trairi Wind Power Plant CDM Project

Developer: ENGIE Brasil Energia S.A

CDM-7023 ↗

#3812of 5087 in Renewable energy#350of 500 in Brazil#4109of 5740 in CDM (UNFCCC)#2731of 3484 in ACM0002

Score from methodology v2.1 (analysis of 25 Sep 2026). Re-assessment under v2.2 pending.

Assessment

CarbonMeld document-based assessment

01020304 Overall 4.7 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

Analysis

The Trairi Wind Power Plant is a standard CDM wind project with a jurisdictional baseline and a reasonable 0% leakage assumption, but the available record is limited to the 2020 validation report and PDD with no monitoring data. Four corrective action requests at validation flagged data-quality issues (coordinates, emission factors, monitoring plan gaps), and the specific additionality test type is not documented in the available documents. Overall, the project is structurally sound for a wind installation but the evidence base is thin and the low extraction confidence limits assurance.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

On this page: the analysis of 25 Sep 2026, marked “Re-assessment pending”. Per-dimension scores, risk indicators, 3 red flags, score factors, detailed analysis, and 4 registry documents (4 analyzed).

€9+ VAT · 30-day pass · one-time, no auto-renewal

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons for 30 days (public-data comparison is free; fair use: 30 projects per day).

Price + VAT · By paying you accept the Terms of Use — digital content, no refunds. How Premium works

Eligibility & market

Transactions in the CDM registry are discontinued as of 31 December 2026 (UNFCCC, checked 6 October 2026). The UNEP-CCC Article 6 Pipeline lists the transition of this activity to the Article 6.4 mechanism as approved. This page keeps the project's record and our analysis.

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

IssuedRetiredAvailable
2023
310,6830310,683
Total310,6830310,683

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →