Skip to main content
CFCUrban Forest CarbonUnited StatesGeneral Methodologyv2.1

Travis County Forest Carbon Offsets

CFC-travis-county-forest-carbon-of ↗

#176of 389 in United States#52of 59 in City Forest Credits (CFC)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

The Travis County urban forest project has VVB-confirmed additionality and a 5% buffer pool, but is burdened by multiple material findings including acreage loss, ownership changes, cattle damage, and herbicide-related mortality. Leakage is entirely unaddressed, and four parcels overlap with a separate project (ID 014), creating a residual double-counting risk. The project over-delivered relative to its pro-rata ex-ante expectation, which is reassuring for credit validity, but the documentation gaps and baseline-method inconsistency temper confidence.

Red Flags

  • Four parcels (Sites 6, 7, 13, 14) are shared with Project ID 014; 0.35 acres of overlap are flagged for removal in a later issuance, creating a residual double-counting risk until resolved.
  • Leakage deduction and justification are both absent from the extracted record, leaving no documented treatment of displacement risk for an urban planting project.
  • Site 10 experienced acreage reduction (4.78 → 2.59 acres), ownership transfer to PINTAIL RESOURCES LLC, cattle fence breach, and ~100% mortality on 0.21 acres from suspected herbicide runoff — multiple concurrent stressors on a single site.
  • Survival rates on Site 12 fell below the 25% threshold anticipated by the methodology, indicating the planting may not achieve projected sequestration.

Credit Vintages

IssuedRetiredAvailable
2020
8710871
2024
3,1102,599511
Total3,9812,5991,382

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Site 10 reversals absorbed

Leakage

No deduction or justification found

Baseline

Project-specific; method label inconsistent across docs

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance mechanism unstated

Double-claim

CORSIA/CCP unstated; 4 parcels shared with Project 014

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents