Travis County Reforestation Program 2021
#29of 80 in ARR (afforestation)#210of 345 in United States#57of 59 in City Forest Credits (CFC)
Audit Analysis
The Travis County Reforestation Program is a VVB-verified urban reforestation project with a confirmed combined additionality test and a 5% buffer pool, but it carries significant material findings including a 1.3-acre area reduction, a baseline canopy correction from 0% to 16.63%, and severe mortality at one site due to drought and fencing failure. The verified ERR of 1,169 tCO₂ for the first ~4-year monitoring period represents roughly 247% of the pro-rata expectation from the 3,076 tCO₂ lifetime ex-ante estimate, indicating the project is over-delivering relative to its revised baseline, though the original PDD claim of 3,831.6 tCO₂ was substantially higher. Leakage treatment is entirely absent from the record, and several safeguards elements (FPIC, grievance mechanism) are undocumented.
Red Flags
- Leakage deduction and justification are entirely absent from all available documents for a reforestation project where displacement of existing vegetation or land-use change is a realistic risk
- Baseline canopy coverage was corrected from 0% to 16.63% during verification, indicating the original PDD overestimated the carbon gain by ignoring pre-existing tree cover
- Site 6 experienced near-100% mortality on 0.21 acres due to herbicide runoff and cattle grazing, with survival rates below the 25% protocol threshold, and extreme drought in Central Texas is expected to continue
- The PDD originally claimed 3,831.6 tCO₂ while the current verified figure is 1,169 tCO₂ — a 69% reduction that, while partly attributable to different reporting bases, signals a materially weaker project than initially presented
- FPIC and grievance mechanism are not documented in any available record despite the project operating on floodplain land with multiple landowner partnerships
- Leakage not addressed in project documentation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 364 | 0 | 364 | |
| 2025 | 1,169 | 217 | 952 | |
| Total | 1,533 | 217 | 1,316 |
Risk Indicators
VVB-confirmed combined test
5% buffer, no reversals, but Site 6 mortality and drought risk
No deduction or justification found in any document
Project-specific; canopy corrected from 0% to 16.63%
Safeguards mentioned but FPIC and grievance mechanism undocumented
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →