VCS Energy demand Guatemala Registry: Late to verify Documentazione completa General Methodology v2.0

TUIK RUCH LEW IMPROVED COOKSTOVE PROJECT FOR LAKE ATITLAN

VCS-2077 ↗

4.5 / 10
Integrity
5.2
Transparency
4.1
Claim Safety
4.6
Documentation
3.2

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project used a barrier-based additionality test in the verification report.

missing The verification report lists numerous findings, including missing annexes, unclear stakeholder processes, and seven corrective actions, which weakens confidence in the project design and monitoring.

Transparency

verified The project has a named verifier, AENOR, and a defined monitoring period from 2018-09-01 to 2020-03-09.

missing The extracted record shows low extraction confidence and only one evidence document is clearly identified, with total credits claimed not found in the available record.

Claim Safety

verified Leakage is treated with a quantified deduction of 5%, and the project uses a local field approach for non-renewable biomass fraction.

missing The project is marked CORSIA-eligible, which keeps dual-channel claim risk relevant, and the contradiction on leakage deduction versus an earlier 95% figure raises over-crediting concerns.

Documentation

verified FPIC, grievance mechanism, benefit sharing, and safeguards are all mentioned in the extracted record.

missing Low extraction confidence, many corrective actions, and missing or inconsistent documentation elements indicate a weak paper trail for a project with a long crediting period.

Detailed Analysis

Integrity

The project has some positive integrity signals: the verification report says additionality was confirmed by the VVB, and the project used a barrier test. However, the same report lists many findings, including missing annexes, weak stakeholder identification, unclear consultation processes, and mitigation gaps for local vendors, which undermines confidence in the project’s overall robustness.

Transparency

Transparency is mixed. The verifier is named as AENOR and the monitoring period is stated, but the extracted record has low extraction confidence and the total credits claimed are not found in the available data. The documentation also appears incomplete, with only one evidence document clearly identified in the extracted record.

Claim Safety

Claim safety is moderate at best. The project applies a quantified leakage deduction of 5% and uses a local field method for the non-renewable biomass fraction, which is better than relying only on defaults. Still, the contradiction showing an earlier 95% leakage figure versus the later 5% value, plus CORSIA eligibility being true, keeps over-crediting and dual-claim risk elevated.

Documentation

Documentation quality is weak. The record shows low extraction confidence, and the verification report itself required multiple clarification requests and corrective actions. Positive items such as FPIC, grievance mechanism, and benefit sharing are mentioned, but several key details are either not stated or were inconsistent across documents.

Overall

The project has a credible core on paper, especially because the VVB confirmed additionality and leakage was quantified, but the evidence base is not clean. I privileged the later verification-report values over earlier conflicting entries for leakage, FPIC, benefit sharing, and additionality framing because they are more recent and appear closer to the final validation/verification record; however, the contradictions still reduce reliability. The many findings, low extraction confidence, and incomplete documentation justify a cautious mid-range score.

Audit Analysis

This is a VCS cookstove project with some positive evidence on additionality, leakage treatment, and safeguards, but the documentation is uneven and the verification report raised many findings. The project appears to have a quantified leakage deduction and VVB-confirmed additionality, yet the low extraction confidence, multiple CARs/CLs, and several unresolved documentation gaps reduce confidence in the claimed credits.

Project Description

Proponent: Asociacion Tuik Ruch Lew Protocol categories: Energy demand Protocols: AMS-II.G. Estimated annual GHG reductions: 1707 tCO2e Region: Latin America Registration date: 2020-09-30

Red Flags

  • The verification report records multiple findings, including six clarification requests and two corrective action requests, plus missing annexes and weak stakeholder documentation.
  • There are contradictions across documents on leakage treatment, additionality test framing, FPIC, and benefit sharing, which weakens reliability.

Credit Vintages

Issued Retired Available
2018
331 172 159
2019
644 0 644
Total 975 172 803

Cosa migliorerebbe questo punteggio

  • Provide a complete, internally consistent document set with all annexes, the missing causal chain, and a reconciled explanation of the leakage and additionality contradictions.
  • Publish clearer monitoring evidence for stove usage, stakeholder consultation, and safeguards, including how findings and corrective actions were closed.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Avoidance project; reversal risk not applicable

Leakage

Quantified 5% deduction

Baseline

Project baseline stated; reassessment timing missing

Safeguards

FPIC and grievance mechanism present, but stakeholder proces

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti