TUIK RUCH LEW IMPROVED COOKSTOVE PROJECT FOR LAKE ATITLAN
#124of 150 in Cookstoves#13of 15 in Guatemala#1080of 1339 in Verra (VCS)#155of 189 in AMS-II.G
Audit Analysis
The Tuik Ruch Lew cookstove project in Guatemala has VVB-confirmed additionality and a quantified leakage deduction, but is undermined by a severe leakage figure contradiction between the PDD (95%) and the monitoring report (5%), calculation errors flagged by the VVB, absence of FPIC, and a very large gap between the PDD's lifetime estimate and the verified monitoring-period result. The project delivered only about 12% of the pro-rata expectation for the elapsed monitoring period, which is conservative but raises questions about baseline assumptions and data reliability.
Red Flags
- Leakage deduction contradicts between documents: the PDD states 95% while the monitoring report states 5% — a 19× difference that fundamentally changes the credit volume and cannot be reconciled without further clarification
- The VVB identified calculation errors and inconsistencies in the SD VISTA MR Calculations Spreadsheet (CAR 01), undermining confidence in the reported 975 tCO2e figure
- FPIC was not conducted according to the verification report, despite the monitoring report suggesting it was — a direct contradiction on a fundamental safeguard requirement
- Registry status is 'Late to verify', indicating the project is behind its verification schedule
- Usage monitoring relies on self-reporting per the verification report, with no independent verification of stove usage rates
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 331 | 172 | 159 | |
| 2019 | 644 | 0 | 644 | |
| Total | 975 | 172 | 803 |
Risk Indicators
VVB-confirmed combined test
cookstove reversion risk
5% quantified but contradicted by PDD's 95%
Project-specific baseline, not jurisdictional
Grievance mechanism present; FPIC not conducted
CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →