The Uberlândia Landfills I and II project is a VCS-registered landfill gas capture project with solid additionality (combined test confirmed by TÜV NORD CERT, negative IRR without CDM revenues) and minimal permanence risk inherent to LFG destruction. However, significant contradictions between the PDD, validation report, and monitoring report on lifetime ERR figures, grid emission factors, and crediting period dates introduce data-reliability concerns, and several sustainability and usage-monitoring details are absent from the extracted record.
Red Flags
- Lifetime ex-ante ERR differs by a factor of ~16 between the PDD (703,656 tCO₂e) and the validation report (43,275 tCO₂e); the PDD figure is privileged as the full-crediting-period estimate, but the discrepancy is unexplained in the documents.
- Grid emission factor differs substantially between the PDD (0.1635) and the monitoring report (0.3593), a 120% difference that materially affects the electricity-displacement component of the ER calculation.
- Crediting period is stated as 6 months in the monitoring report but 7 years in the validation report; the 7-year period is privileged as consistent with VCS registration norms.
- Only a single 6-month monitoring period is documented for a 7-year crediting period, leaving the majority of the crediting period unverified in the available record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 40,093 | 40,090 | 3 | |
| Total | 40,093 | 40,090 | 3 |
Risk Indicators
VVB-confirmed combined test, negative IRR
LFG destruction, no reversal risk
0% deemed negligible, source capture
Project-specific, reassessment not yet due
Mentioned but FPIC not conducted, grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →