Vai al contenuto principale
VCS Livestock, enteric fermentation, and manure management United Kingdom Registry: Registered Documentazione completa General Methodology v2.0

UK CowCredit project: A UK dairy initiative to reduce methane from enteric fermentation

VCS-2072 ↗

4.4 / 10
Integrity
5.1
Transparency
4.2
Claim Safety
3.9
Documentation
4.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project used a common-practice test under the VCS methodology.

missing Leakage treatment is only described as negligible, while the record also contains a contradiction suggesting another document quantified leakage; reversal risk is stated as not addressed in the extracted record.

Transparency

verified The monitoring period, registry, methodology, and VVB name are stated, and the verification report records multiple CARs and CLs as closed.

missing The verification report lists missing information on eligibility criteria, monitoring procedures, stakeholder consultation, and a KML file, and extraction confidence is low.

Claim Safety

verified The project is in the UK under VCS, with a stated leakage deduction of 0% and no non-permanence risk identified for the activity.

missing The record contains a major contradiction in total verified ERs and another in the additionality/leakage narrative, which weakens confidence in the claimed climate benefit.

Documentation

verified Multiple official documents were used, and the verification report shows several CARs and CLs were closed.

missing Extraction confidence is low, the evidence list is sparse, and key items such as baseline reassessment timing and usage monitoring details are not stated.

Detailed Analysis

Integrity

The project has some positive integrity signals: the VVB confirmed additionality, the project uses a common-practice test, and the record says there is no non-permanence risk identified for the activity. However, the verification report also records missing eligibility criteria, missing cluster-requirement assessment, and concerns about the supplement efficacy evidence being based on a single study, which weakens confidence in the robustness of the crediting approach.

Transparency

Transparency is mixed because the monitoring period, registry, methodology, and VVB are identified, and the verification report shows several CARs and CLs were closed. At the same time, the report flags missing KML files, missing stakeholder-consultation details, missing monitoring-method detail, and missing overall eligibility conclusions, while the low extraction confidence further reduces trust in completeness.

Claim Safety

Claim safety is weakened by the contradiction in verified issuance, where one document path indicates 309 credits while another indicates 2,994 credits; I privileged the later verification-report figure because it is the more recent and apparently authoritative extracted source, but the discrepancy itself is a serious reliability concern. The project also has a contradiction on leakage treatment and a mismatch in how additionality was characterized across documents, so the climate claim should be treated conservatively despite the stated 0% leakage deduction.

Documentation

Documentation quality is only moderate because multiple official documents were used and the verification report shows corrective actions were raised and closed. Still, the extracted record has low extraction confidence, the evidence list is not informative, and several key items are not stated, including baseline reassessment timing, usage monitoring method, and any quantified FNRB value.

Overall

Overall, I privileged the 2023 verification-report values where contradictions existed because they are the most recent and appear to be the final verification-stage source, but the contradictions themselves materially reduce reliability. The project looks better than average on additionality and permanence, yet the documentation gaps, low extraction confidence, and conflicting issuance figures keep the score in the mid range. Because integrity remains above the gating threshold, the overall score is not capped, but the project should still be viewed cautiously.

Audit Analysis

This is a registered VCS livestock project with VVB-confirmed additionality and no reported reversal events, but the evidence record shows several documentation gaps and multiple unresolved-quality concerns in the verification materials. The biggest issue is reliability: the extracted record contains major contradictions in verified issuance and in how key methodological elements were described, so the claim should be treated cautiously.

Project Description

Proponent: MOOTRAL SA Protocol categories: Livestock, enteric fermentation, and manure management Protocols: VM0041 Estimated annual GHG reductions: 187563 tCO2e Region: Europe Registration date: 2020-11-05

Red Flags

  • The extracted record shows a large contradiction in verified issuance, with one source indicating 309 credits and another 2,994 credits, which raises reliability concerns about the reporting trail.
  • Several material findings point to incomplete project documentation, including missing eligibility criteria, missing monitoring-method detail, and a missing KML file for the grouped project.

Credit Vintages

Issued Retired Available
2019
247 109 138
2020
415 353 62
2021
420 420 0
2022
2,221 227 1,994
Total 3,303 1,109 2,194

Cosa migliorerebbe questo punteggio

  • Provide a clean, reconciled issuance trail that explains the 309 versus 2,994 verified ER discrepancy and identifies the final authoritative figure.
  • Publish complete monitoring and verification annexes covering cluster eligibility, animal counts, leakage rationale, stakeholder consultation, and the missing KML file.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed common-practice test

Permanence

No non-permanence risk identified

Leakage

0% deduction with weak/contradictory support

Baseline

Project baseline; reassessment timing not stated

Safeguards

FPIC and grievance mechanism present, but partial documentat

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti