UpEnergy – Social and Climate Impact Programme-Cooking Devices VPA-25
GS-4303 ↗ · current registry ID: GS12377
#130of 1329 in Industrial#5of 33 in Zambia#249of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cooking-device project in Zambia with VVB-confirmed additionality, no reported reversal events, and all corrective actions closed. However, the absence of a buffer pool over a long crediting period, a 0% leakage deduction, and a notable discrepancy in claimed ERR figures between monitoring periods introduce moderate risk. The lack of verified ERR and an ex-ante lifetime estimate limits the ability to confirm the project is delivering as claimed.
Red Flags
- No buffer pool is documented for a crediting period extending to 2040, leaving no financial backstop against potential reversal or under-delivery.
- Claimed ERR of 100,132 (2024 monitoring report) is roughly half the 196,633 reported in the 2020 monitoring report, and no ex-ante lifetime estimate is available to benchmark delivery against.
- The verification report (2024) records a crediting period of 2021–2040 while the validation report (2025) records 2026–2030, a discrepancy that undermines confidence in the project's temporal boundaries.
- WBTs were not conducted for the 2022–2024 monitoring period; KPTs were used instead, and a corrective action requires WBTs before the next verification.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 17,526 | 0 | 17,526 | |
| 2024 | 52,367 | 0 | 52,367 | |
| 2025 | 17,393 | 0 | 17,393 | |
| Total | 87,286 | 0 | 87,286 |
Risk Indicators
VVB-confirmed combined test
no reversal events
0% deduction, quantified but not detailed
Project-specific; reassessment timing not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →