Urfa - Yenice LFG to Energy Project
GS-4247 ↗ · current registry ID: GS12311
#86of 268 in Biogas#201of 295 in Turkey#748of 1801 in Gold Standard (GS)#55of 159 in ACM0001
Audit Analysis
The Urfa-Yenice landfill gas-to-energy project has VVB-confirmed additionality and a reasonable verified ERR (96.5% of pro-rata expectation), but is undermined by the absence of a buffer pool, a project-specific modeled baseline, 16 outstanding corrective actions (including a questioned financial viability with IRR at −18%), and a contradiction in how leakage is justified across documents. The project is in its first 9 months of a 5-year crediting period, so the monitoring record is still thin.
Red Flags
- No buffer pool or permanence mechanism identified in any available document, leaving reversal risk unmitigated for a 5-year crediting period.
- 16 corrective actions remain open, including the VVB's request to clarify financial viability given an equity IRR of −18%, undefined operational lifetime, and an unjustified 10-vs-15-year investment period.
- Leakage justification is contradictory: the verification report (Nov 2024) states it is 'quantified' while the monitoring report (Nov 2024) states it is 'deemed negligible,' yet the deduction is 0%.
- Six material findings relate to missing or out-of-period calibration documentation for flow meters, gas analyzers, and electricity meters, each requiring ad-hoc correction factors of 0.3–0.5%.
- FPIC was not conducted despite the project operating in a community setting in Turkey.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 114,253 | 12,201 | 102,052 | |
| Total | 114,253 | 12,201 | 102,052 |
Risk Indicators
VVB-confirmed combined test
no reversals yet
0% deduction; contradictory justification
Project-specific, modeled; no reassessment date
Grievance & benefit-sharing present; no FPIC
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →