Urla Wind Power Plant
#718of 1935 in Renewable energy#151of 295 in Turkey#427of 1339 in Verra (VCS)#563of 1287 in ACM0002
Audit Analysis
The Urla Wind Power Plant is a straightforward renewable energy avoidance project with VVB-confirmed additionality and a reasonable leakage treatment, but the verification cycle surfaced seven material findings and three corrective actions that raise concerns about data accuracy and documentation quality. The ERR figures are broadly consistent on a pro-rata basis (~94% of expected delivery), and the project's inherent low permanence risk as a wind avoidance project is a positive. However, the baseline method contradiction between documents, unexplained generation data variation, and unit errors in the monitoring report temper confidence in the underlying data.
Red Flags
- Finding 4 in the verification report flags an unexplained significant variation in electricity generation data across the monitoring period, which undermines confidence in the monitored output figures
- Finding 3 reports incorrect units for NCVi,y and incorrect values for EFCO2,i,y in the monitoring report, indicating a data accuracy problem in the core emissions calculation
- Baseline method is described as 'project' in the verification report but 'jurisdictional' in the monitoring report — a contradiction that, while possibly reflecting different aspects of the same calculation, signals inconsistent documentation
- The monitoring report referenced Gold Standard rules (Finding 5) despite the project being registered under VCS, suggesting template confusion that could affect the reliability of the MR
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 3,795 | 3,795 | 0 | |
| 2017 | 31,520 | 7,986 | 23,534 | |
| 2018 | 31,058 | 0 | 31,058 | |
| 2019 | 32,655 | 0 | 32,655 | |
| 2020 | 34,553 | 0 | 34,553 | |
| 2021 | 21,305 | 0 | 21,305 | |
| Total | 154,886 | 11,781 | 143,105 |
Risk Indicators
Combined test confirmed by VVB
Avoidance project, no reversal risk
0% justified as negligible for wind
Project-specific, method contradiction in docs
Grievance mechanism present, FPIC not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →