5.5/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

The Urla Wind Power Plant is a straightforward renewable energy avoidance project with VVB-confirmed additionality and a reasonable leakage treatment, but the verification cycle surfaced seven material findings and three corrective actions that raise concerns about data accuracy and documentation quality. The ERR figures are broadly consistent on a pro-rata basis (~94% of expected delivery), and the project's inherent low permanence risk as a wind avoidance project is a positive. However, the baseline method contradiction between documents, unexplained generation data variation, and unit errors in the monitoring report temper confidence in the underlying data.

Red Flags

  • Finding 4 in the verification report flags an unexplained significant variation in electricity generation data across the monitoring period, which undermines confidence in the monitored output figures
  • Finding 3 reports incorrect units for NCVi,y and incorrect values for EFCO2,i,y in the monitoring report, indicating a data accuracy problem in the core emissions calculation
  • Baseline method is described as 'project' in the verification report but 'jurisdictional' in the monitoring report — a contradiction that, while possibly reflecting different aspects of the same calculation, signals inconsistent documentation
  • The monitoring report referenced Gold Standard rules (Finding 5) despite the project being registered under VCS, suggesting template confusion that could affect the reliability of the MR

Credit Vintages

IssuedRetiredAvailable
2016
3,7953,7950
2017
31,5207,98623,534
2018
31,058031,058
2019
32,655032,655
2020
34,553034,553
2021
21,305021,305
Total154,88611,781143,105

Risk Indicators

Additionality

Combined test confirmed by VVB

Permanence

Avoidance project, no reversal risk

Leakage

0% justified as negligible for wind

Baseline

Project-specific, method contradiction in docs

Safeguards

Grievance mechanism present, FPIC not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents