Veolia LFG PTA Antanas landfill
#92of 189 in Methane#78of 124 in Colombia#58of 99 in CerCarbono (CC)#85of 159 in ACM0001
Audit Analysis
The Veolia Antanas landfill gas project has VVB-confirmed additionality and a conservative verified-to-claimed ratio, but is undermined by repeated calibration deficiencies flagged by ICONTEC, a project-specific modeled baseline with no buffer pool, and contradictory leakage justifications within the same verification report. The project delivered only about 14% of its pro-rata lifetime expectation for the monitoring period, suggesting the ex-ante baseline may be overstated.
Red Flags
- Multiple calibration certificates and procedures were missing or non-compliant during the monitoring period (CAR01–CAR03, CL01), requiring conservative error deductions and corrective actions before issuance
- Leakage justification is internally contradictory within the verification report: stated as 'deemed negligible' in one passage and 'quantified' in another, with a 0% deduction applied
- Free, Prior and Informed Consent (FPIC) was not conducted, and no grievance mechanism is documented
- Crediting period is inconsistent between the validation report (20 years, 2020–2040) and the verification report (7 years, 2017–2024)
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 2,016 | 2,016 | 0 | |
| 2021 | 6,188 | 6,188 | 0 | |
| 2022 | 6,897 | 6,897 | 0 | |
| 2023 | 34,095 | 34,095 | 0 | |
| Total | 49,196 | 49,196 | 0 |
Risk Indicators
VVB-confirmed combined test; capture not legally required
no reversal events reported but risk unmitigated
0% deduction with contradictory justification (negligible vs quantified)
Project-specific modeled baseline; no reassessment date stated
No FPIC, no grievance mechanism documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →