Viet Nam Improved Cookstove Project by KCM – Improved Cookstove Project in Hoa Binh Province – CPA 001
#108of 150 in Cookstoves#68of 80 in Vietnam#983of 1339 in Verra (VCS)#138of 189 in AMS-II.G
Audit Analysis
A VCS cookstove project in Hoa Binh Province with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by 16 material findings, 19 corrective actions, a significant efficiency-parameter calculation error, and multiple cross-document contradictions. The self-reported usage monitoring and project-specific baseline add moderate risk, while the verified usage rate exceeding the assumed rate is a positive signal. Overall, the project's data quality and documentation integrity are below acceptable thresholds for high-confidence crediting.
Red Flags
- 16 material findings and 19 corrective actions identified in the verification report, including an incorrect efficiency parameter (29.41% vs 24.01%) used in ER calculations
- Contradiction on reversal events: the earlier verification report (Dec 2023) reported reversal events, while the later one (Oct 2024) states the topic was not addressed
- FPIC status contradicted between the verification report (conducted) and the monitoring report (not conducted)
- Usage monitoring relies on self-reporting rather than independent verification
- Missing information on ownership of carbon rights and on stove replacement/continuity after the 5-year lifespan
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 35,746 | 0 | 35,746 | |
| 2022 | 35,746 | 0 | 35,746 | |
| Total | 71,492 | 0 | 71,492 |
Risk Indicators
VVB-confirmed
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, no reassessment date stated
FPIC contradicted, grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →