Skip to main content
GSEnergy Efficiency - DomesticBangladeshGeneral Methodologyv2.1

VPA 1 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh

GS-599 ↗ · current registry ID: GS3544

#744of 1329 in Industrial#90of 121 in Bangladesh#1116of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.8
Transparency
5.2
Claim Safety
4.8
Documentation
4.2

Audit Analysis

A Gold Standard cook-stove project in Bangladesh with VVB-confirmed additionality and a reputable verifier (TÜV NORD CERT), but undermined by a project-specific baseline, an unaddressed permanence risk (no buffer pool), a very low leakage deduction, and an extensive list of data-quality findings and corrective actions. The project is CCP-eligible, which provides some third-party oversight, but the overall evidence base shows significant internal inconsistencies that reduce confidence in the reported emission reductions.

Red Flags

  • No buffer pool or permanence mechanism identified for a cook-stove project where users can revert to traditional stoves; no reversal-event data reported across any monitoring period.
  • Leakage deduction of 0.95% (per the 2023 verification report) is extremely low for a domestic cook-stove project; the 2023 monitoring report states 5%, creating an unresolved contradiction within the same reporting cycle.
  • 28 corrective actions were required by the VVB, including inconsistencies in emission-reduction calculations, missing sample calculations, and a challenged 28-year PoA duration against the Gold Standard 20-year maximum.
  • Baseline is project-specific with no documented reassessment date; the 2022 validation report references a different crediting period (2021–2026) than the 2023 verification report (2014–2024).
  • No lifetime ex-ante emission-reduction estimate is available in the extracted record, preventing a pro-rata delivery check against the 262,185 tCO₂e verified for the 2020–2022 monitoring period.

Credit Vintages

IssuedRetiredAvailable
2014
5,4015,4010
2015
10,0379,906131
2016
9,0839,05627
2017
9,0151808,835
2018
8,7241,3627,362
2019
8,44808,448
2020
1,3821,33745
Total52,09027,24224,848

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk unaddressed

Leakage

0.95% deduction; contradictory 5% in MR

Baseline

Project-specific; no reassessment date

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CCP eligible; CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-07General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents