VPA 1 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-599 ↗ · current registry ID: GS3544
#744of 1329 in Industrial#90of 121 in Bangladesh#1116of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cook-stove project in Bangladesh with VVB-confirmed additionality and a reputable verifier (TÜV NORD CERT), but undermined by a project-specific baseline, an unaddressed permanence risk (no buffer pool), a very low leakage deduction, and an extensive list of data-quality findings and corrective actions. The project is CCP-eligible, which provides some third-party oversight, but the overall evidence base shows significant internal inconsistencies that reduce confidence in the reported emission reductions.
Red Flags
- No buffer pool or permanence mechanism identified for a cook-stove project where users can revert to traditional stoves; no reversal-event data reported across any monitoring period.
- Leakage deduction of 0.95% (per the 2023 verification report) is extremely low for a domestic cook-stove project; the 2023 monitoring report states 5%, creating an unresolved contradiction within the same reporting cycle.
- 28 corrective actions were required by the VVB, including inconsistencies in emission-reduction calculations, missing sample calculations, and a challenged 28-year PoA duration against the Gold Standard 20-year maximum.
- Baseline is project-specific with no documented reassessment date; the 2022 validation report references a different crediting period (2021–2026) than the 2023 verification report (2014–2024).
- No lifetime ex-ante emission-reduction estimate is available in the extracted record, preventing a pro-rata delivery check against the 262,185 tCO₂e verified for the 2020–2022 monitoring period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 5,401 | 5,401 | 0 | |
| 2015 | 10,037 | 9,906 | 131 | |
| 2016 | 9,083 | 9,056 | 27 | |
| 2017 | 9,015 | 180 | 8,835 | |
| 2018 | 8,724 | 1,362 | 7,362 | |
| 2019 | 8,448 | 0 | 8,448 | |
| 2020 | 1,382 | 1,337 | 45 | |
| Total | 52,090 | 27,242 | 24,848 |
Risk Indicators
VVB-confirmed combined test
reversal risk unaddressed
0.95% deduction; contradictory 5% in MR
Project-specific; no reassessment date
FPIC, grievance mechanism, benefit sharing documented
CCP eligible; CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →