Skip to main content
GSEnergy Efficiency - DomesticBangladeshGeneral Methodologyv2.1

VPA 13 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh

GS-750 ↗ · current registry ID: GS4378

#1132of 1329 in Industrial#117of 121 in Bangladesh#1586of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.0
Documentation
3.5

Audit Analysis

This Gold Standard cookstove project in Bangladesh has a sound design foundation with VVB-confirmed additionality and a quantified 5% leakage deduction, but is undermined by a large volume of data-quality findings (35+ material findings, 27 corrective actions), an unresolved internal contradiction in the claimed ERR within the same monitoring report, and the absence of a stated buffer pool or baseline reassessment schedule. The project's claim safety is further weakened by a project-specific baseline, a PoA duration that exceeded the Gold Standard 20-year maximum (justified via transition rules), and the lack of a lifetime ex-ante ERR figure to enable a proper pro-rata delivery check.

Red Flags

  • The monitoring report (2023-10-18) contains two different claimed ERR values — 262,185 and 157,839 — within the same document, creating a 65% discrepancy that cannot be resolved from the available record.
  • 35+ material findings and 27 corrective actions were raised by TÜV NORD CERT, including inconsistent ER values across MR sections, missing sample calculations, and widespread database errors (47,508 missing phone numbers, invalid entries).
  • The PoA duration of 28 years exceeded the Gold Standard 20-year maximum and was only justified via transition rules (CAR 02), raising questions about the robustness of the project design.
  • The lifetime ex-ante ERR estimate is not found in the extracted record, preventing a meaningful pro-rata comparison of verified delivery against the original design estimate.

Credit Vintages

IssuedRetiredAvailable
2014
1,8061,8060
2015
10,00010,0000
2016
7,4287,4280
2017
3,7393,7390
2018
3,6176632,954
2019
3,503473,456
2020
5730573
Total30,66623,6836,983

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk unaddressed

Leakage

Quantified 5% deduction

Baseline

Project-specific; no reassessment date stated

Safeguards

FPIC and grievance confirmed in 2023; earlier report inconsistent

Double-claim

CCP eligible; CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-07General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents