VPA 174 EcoZoom Improved Stove Programme, Uganda
GS-1516 ↗ · current registry ID: GS7317
#994of 1329 in Industrial#126of 163 in Uganda#1425of 1801 in Gold Standard (GS)
Audit Analysis
The EcoZoom improved cookstove programme in Uganda has a verified additionality test and no reversal events, but is undermined by 13 cross-document contradictions, a 0% leakage deduction (reduced from 5% in the PDD), a verified usage rate 24% below the assumed rate, and a stove lifetime revision from 5 to 7 years that inflates claimed reductions. The extensive list of corrective actions and material findings signals ongoing quality-control issues that erode confidence in the credit's integrity.
Red Flags
- Verified usage rate (0.6836) is 24% below the assumed rate (0.90), indicating the project is under-delivering relative to its design assumptions
- Stove lifetime was revised upward from 5 to 7 years mid-crediting-period, increasing claimed reductions without a full re-baselining
- Leakage deduction reduced from 5% (PDD, 2023) to 0% (verification report, 2026) with justification shifting from 'deemed negligible' to 'quantified'—inconsistent treatment
- 13 contradictions across documents, including conflicting fNRB methods (national default vs. local field), conflicting additionality test types (combined vs. investment), and conflicting FPIC status
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 1 | 1 | 0 | |
| 2019 | 2,166 | 2,166 | 0 | |
| 2020 | 6,656 | 6,656 | 0 | |
| 2021 | 7,083 | 7,056 | 27 | |
| 2022 | 7,078 | 2,353 | 4,725 | |
| 2023 | 4,088 | 0 | 4,088 | |
| Total | 27,072 | 18,232 | 8,840 |
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction; justification inconsistent
Project-specific; reassessed 2024
Partial; FPIC contradictory
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →