Skip to main content
GSEnergy Efficiency - DomesticBangladeshGeneral Methodologyv2.1

VPA 23 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh

GS-762 ↗ · current registry ID: GS4388

#1133of 1329 in Industrial#118of 121 in Bangladesh#1587of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.0
Documentation
3.5

Audit Analysis

This Gold Standard cookstove project in Bangladesh has a VVB-verified additionality assessment and a conservative national-default fNRB, but is undermined by an extensive list of roughly 30 material findings, significant ERR figure contradictions between verification reports, a 6.6% gap between assumed and verified usage rates, and the absence of any buffer pool or stated permanence mechanism. The documentation quality is poor, with numerous data inconsistencies, missing calculations, and unresolved corrective actions, raising meaningful concerns about the reliability of the verified emission reductions.

Red Flags

  • Verified ERR dropped from 350,831 (June 2023 verification report) to 262,185 (October 2023 verification report) — a 25% reduction between two verification reports in the same year, with no clear explanation in the extracted record
  • Approximately 30 material findings and 25 corrective actions identified by TÜV NORD CERT, including unit inconsistencies, missing sample calculations, missing spreadsheet references, and data transfer errors across the monitoring report and ER worksheet
  • Usage rate assumed at 0.99 but verified at only 0.93 — a 6.6% overestimation that inflates claimed reductions
  • No buffer pool percentage or permanence mechanism found in any available document, leaving reversal risk unaddressed for a project where stoves have a finite 5–7 year lifespan
  • Leakage deduction of only 0.95% per the verification report, while the monitoring report (October 2023) lists 5% and characterises leakage as 'not addressed' — a five-fold discrepancy

Credit Vintages

IssuedRetiredAvailable
2015
9,3399,3390
2016
8,3208,3200
2017
5,7925,7920
2018
5,6031,0264,577
2019
5,42505,425
2020
8880888
Total35,36724,47710,890

Risk Indicators

Additionality

VVB-verified combined test

Permanence

mixed evidence / unresolved risk

Leakage

0.95% deduction; contradicted by MR at 5%

Baseline

Project-specific; no reassessment date stated

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CCP eligible; CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-07General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents