VPA 50 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-3808 ↗ · current registry ID: GS11747
#653of 1329 in Industrial#86of 121 in Bangladesh#992of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Bangladesh with a confirmed combined additionality test and a 5% quantified leakage deduction, but undermined by ten cross-document contradictions (including a direct FPIC conflict and a 48% gap in reported emission reductions between the monitoring and verification reports), a project-specific baseline, CCP eligibility creating dual-channel risk, and a long list of administrative corrective actions. The core methodology is sound for the sector, but data reliability and documentation quality are below the level expected for a mature credit.
Red Flags
- FPIC status directly contradicted: the 2024 verification report states FPIC was not conducted, while the 2023 validation report states it was — a fundamental safeguards discrepancy that was never reconciled
- Emission reduction figures differ by 48% between the monitoring report (352,957 tCO₂e) and the 2024 verification report (523,571 tCO₂e) for what appears to be the same monitoring window, with no documented explanation for the gap
- Crediting period is stated as 15 years (2021–2036) in the monitoring report but 5 years (2021–2026) in the validation report; the material findings note a 28-year PoA duration challenged against the Gold Standard 20-year maximum, resolved only via transition rules
- Eighteen or more corrective actions were issued across validation and verification, including unresolved questions about stakeholder consultation scope, grievance mechanism implementation at branch offices, and double-counting prevention via serial-number tracking
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 456 | 456 | 0 | |
| 2022 | 9,785 | 7,819 | 1,966 | |
| 2023 | 8,439 | 8,271 | 168 | |
| Total | 18,680 | 16,546 | 2,134 |
Risk Indicators
Combined test, VVB-confirmed
reversal risk unquantified
5% quantified deduction
Project-specific; reassessment date not stated
FPIC contradicted; grievance mechanism present but with open CARs
CCP-eligible; CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →