VPA 62 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-3824 ↗ · current registry ID: GS11759
#18of 1329 in Industrial#4of 121 in Bangladesh#71of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Bangladesh with a verified combined additionality test, quantified 5% leakage deduction, and conservative usage-rate assumptions. However, the project-specific baseline, a contradiction in FPIC status across documents, and a large number of administrative corrective actions temper confidence. The project is inherently low-risk on permanence given its avoidance nature, but documentation quality and baseline robustness leave room for improvement.
Red Flags
- FPIC status is contradictory: the 2024 verification report states FPIC was not conducted, while the 2023 validation report states it was — this is a material safeguards discrepancy
- Additionality verification status flipped between the 2023 verification report (not verified) and the 2024 verification report (verified), raising questions about the robustness of the initial assessment
- Crediting period expanded from 5 years (2021–2026, per 2022 validation report) to 15 years (2021–2036, per 2024 monitoring report) without a clear documented justification in the extracted record
- FNRB method changed from local field measurement (2023 validation) to national default (2024 verification), which may indicate a shift away from project-specific data
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 9,408 | 9,408 | 0 | |
| 2023 | 8,439 | 8,278 | 161 | |
| Total | 17,847 | 17,686 | 161 |
Risk Indicators
VVB-confirmed combined test (2024)
Avoidance project, no reversal risk
5% quantified deduction
Project-specific, no reassessment date
Grievance present, FPIC contradictory
CCP eligible, CORSIA not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →