VPA 65 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-3826 ↗ · current registry ID: GS11762
#814of 1329 in Industrial#101of 121 in Bangladesh#1210of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove VPA in Bangladesh has a confirmed additionality assessment and a quantified 5% leakage deduction, but is undermined by 11 cross-document contradictions, 18+ corrective actions, a project-specific baseline, and a striking discrepancy between the ex-ante lifetime estimate (49,146) and the single-year verified figure (523,571) that cannot be reconciled without a unit or scope explanation. The project is functional but carries meaningful data-reliability and over-crediting risk.
Red Flags
- Ex-ante lifetime ERR of 49,146 versus a single-year verified ERR of 523,571 implies the project delivered roughly 160× the pro-rata expectation for the elapsed period, a discrepancy that is unexplained in the available documents and may indicate a unit mismatch, a per-unit vs. total scope error, or genuine over-crediting.
- Eleven contradictions across documents, including the additionality verification status flipping from unconfirmed (2023) to confirmed (2024), the FNRB method changing from local field to national default, and the crediting period shifting from 5 years to 15 years, raise material questions about data consistency.
- FPIC is recorded as not conducted in the most recent verification report (Aug 2024) but as conducted in the earlier validation report (Apr 2023); the more recent and authoritative document is privileged, leaving a safeguards gap.
- Eighteen or more corrective actions were required across the verification and validation cycles, spanning formatting, methodology naming, stakeholder consultation, grievance mechanism implementation, and double-counting prevention for stove serial numbers.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 8,576 | 8,576 | 0 | |
| 2023 | 8,439 | 8,295 | 144 | |
| Total | 17,015 | 16,871 | 144 |
Risk Indicators
VVB-confirmed combined test, but status was unconfirmed in the prior cycle
mixed evidence / unresolved risk
5% quantified deduction with justification
Project-specific baseline; reassessment timing not stated in available documents
Grievance mechanism present, but FPIC recorded as not conducted in the most recent verification
CCP-eligible; CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →