VPA 68 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-4143 ↗ · current registry ID: GS11765
#746of 1329 in Industrial#92of 121 in Bangladesh#1119of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove VPA in Bangladesh has a VVB-verified combined additionality test and a quantified 5% leakage deduction, but is undermined by a striking 53× gap between the lifetime ex-ante estimate (49,146 tCO₂e) and the single-year verified figure (523,571 tCO₂e), a project-specific baseline, and numerous administrative corrective actions. The project's safeguards framework is partially documented (grievance mechanism present, FPIC not conducted), and multiple cross-document contradictions reduce confidence in the reported figures.
Red Flags
- Verified ERR of 523,571 tCO₂e for a single monitoring year is approximately 53× the pro-rata expectation derived from the 49,146 tCO₂e lifetime ex-ante estimate over a 5-year crediting period, raising serious over-crediting concerns
- FPIC was not conducted per the 2024 verification report, despite the project targeting household-level cookstove adoption in Bangladesh
- Eleven cross-document contradictions were identified across ERR figures, additionality status, FNRB method, leakage rate, usage rate, and crediting period dates
- The 2023 verification report recorded additionality as not verified, while the 2024 report confirms it — the basis for the reversal is not explained in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 8,577 | 8,577 | 0 | |
| 2023 | 8,439 | 8,295 | 144 | |
| Total | 17,016 | 16,872 | 144 |
Risk Indicators
VVB-confirmed combined test
low reversal risk for cookstoves
5% quantified deduction applied
Project-specific; reassessment date not stated
Grievance mechanism present; FPIC not conducted
CCP eligible; CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →