Skip to main content
GSEnergy Efficiency - DomesticBangladeshGeneral Methodologyv2.1

VPA 70 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh

GS-4145 ↗ · current registry ID: GS11767

#136of 1329 in Industrial#23of 121 in Bangladesh#255of 1801 in Gold Standard (GS)

5.8/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A Gold Standard improved cookstove project in Bangladesh with VVB-confirmed additionality and a quantified 5% leakage deduction, but weakened by a project-specific baseline, absence of a documented buffer pool or permanence mechanism, non-conduct of FPIC, and a substantial list of corrective actions spanning multiple documents. The project delivered its claimed emissions reductions for the monitored period, though the lack of a lifetime ex-ante estimate limits the ability to assess long-term over- or under-delivery.

Red Flags

  • FPIC was not conducted (per the 2024 verification report), despite the project directly affecting household users in Bangladesh
  • 18+ corrective actions were required across verification and validation, including substantive issues on PoA duration compliance, grievance mechanism implementation, and stakeholder consultation
  • Eleven contradictions were identified across documents, including conflicting additionality status, leakage percentages, and crediting period dates

Credit Vintages

IssuedRetiredAvailable
2022
8,3118,3110
2023
8,4398,295144
Total16,75016,606144

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction with justification

Baseline

Project-specific; reassessment timing not stated

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CCP eligible; CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents