Skip to main content
GSEnergy Efficiency - DomesticBangladeshGeneral Methodologyv2.1

VPA 76 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh

GS-4150 ↗ · current registry ID: GS11773

#334of 1329 in Industrial#56of 121 in Bangladesh#544of 1801 in Gold Standard (GS)

5.3/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A Gold Standard improved cookstove VPA in Bangladesh with VVB-confirmed additionality and a quantified 5% leakage deduction, but weakened by a project-specific baseline, absence of a stated buffer pool, a contradiction on whether FPIC was conducted, and numerous administrative corrective actions. The project is CCP-eligible and uses a conservative usage-rate assumption, but the lack of a lifetime ex-ante estimate prevents a meaningful pro-rata delivery check.

Red Flags

  • FPIC status is contradictory: the 2024 verification report states it was not conducted, while the 2023 validation report states it was — the more recent verification report is privileged, leaving a safeguards gap for a household-level project in Bangladesh.
  • Leakage deduction differs by a factor of 100 between the 2023 monitoring report (0.05%) and the 2024 verification report (5%); the 2024 figure is privileged but the discrepancy undermines confidence in the MRV chain.
  • 18+ corrective actions were raised by the VVB, including missing major-changes list, PoA duration compliance questions, and unconfirmed grievance-book implementation at branch offices.

Credit Vintages

IssuedRetiredAvailable
2022
7,8257,8250
2023
8,4398,309130
Total16,26416,134130

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

finite stove life

Leakage

5% quantified deduction

Baseline

Project-specific; no reassessment date

Safeguards

Grievance present; FPIC not conducted per 2024 report

Double-claim

CCP eligible; CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents