Skip to main content
GSEnergy Efficiency - DomesticBangladeshGeneral Methodologyv2.1

VPA 84 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh

GS-4155 ↗ · current registry ID: GS11781

#291of 1329 in Industrial#48of 121 in Bangladesh#474of 1801 in Gold Standard (GS)

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A Gold Standard improved cookstove project in Bangladesh with VVB-confirmed additionality and a quantified 5% leakage deduction, but lacking a buffer pool, FPIC, and a lifetime ex-ante emission estimate. Multiple administrative contradictions across documents and an extensive corrective-actions list temper confidence, while the verified usage rate exceeding the assumed rate is a positive signal. CCP eligibility introduces a moderate double-claiming risk.

Red Flags

  • FPIC not conducted per the 2024 verification report, despite the project targeting household-level cookstove users
  • CCP status is 'eligible', creating potential for dual-channel credit use without CORSIA exclusion confirmed
  • No lifetime ex-ante emission reduction estimate found, preventing a pro-rata over/under-delivery check
  • Extensive corrective-actions list (17+ items) spanning formatting, methodology naming, stakeholder consultation, and SDG tool completeness

Credit Vintages

IssuedRetiredAvailable
2022
6,9936,9930
2023
8,44008,440
Total15,4336,9938,440

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction with justification

Baseline

Project-specific baseline, reassessment date not stated

Safeguards

Grievance mechanism present but FPIC not conducted

Double-claim

CCP eligible, CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents