Skip to main content
GSEnergy Efficiency - DomesticBangladeshGeneral Methodologyv2.1

VPA 85 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh

GS-4156 ↗ · current registry ID: GS11782

#139of 1329 in Industrial#26of 121 in Bangladesh#258of 1801 in Gold Standard (GS)

5.8/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A Gold Standard cookstove project in Bangladesh with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant documentation gaps including no stated buffer pool, contradictory FPIC findings across documents, and 18+ corrective actions raised by the VVB. The project is CCP-eligible and uses conservative usage-rate assumptions, but the absence of a lifetime ex-ante ERR figure and a project-specific baseline limit confidence in long-term claim robustness.

Red Flags

  • FPIC status contradicts between the validation report (conducted) and the 2024 verification report (not conducted); the more recent verification report indicates FPIC was not carried out
  • 18+ corrective actions required by the VVB, including unresolved questions on double-counting prevention (unique serial numbers), credit ownership transfer evidence, and stakeholder consultation compliance
  • No lifetime ex-ante ERR figure found in any document, preventing a meaningful pro-rata over/under-delivery assessment
  • Baseline is project-specific with no reassessment date stated, and the PDD dates from 2015/2020

Credit Vintages

IssuedRetiredAvailable
2022
6,3446,3440
2023
8,44008,440
Total14,7846,3448,440

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction with justification

Baseline

Project-specific, no reassessment date stated

Safeguards

Grievance mechanism present; FPIC not conducted per 2024 VR

Double-claim

CCP-eligible; CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents