VPA 85 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-4156 ↗ · current registry ID: GS11782
#139of 1329 in Industrial#26of 121 in Bangladesh#258of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Bangladesh with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant documentation gaps including no stated buffer pool, contradictory FPIC findings across documents, and 18+ corrective actions raised by the VVB. The project is CCP-eligible and uses conservative usage-rate assumptions, but the absence of a lifetime ex-ante ERR figure and a project-specific baseline limit confidence in long-term claim robustness.
Red Flags
- FPIC status contradicts between the validation report (conducted) and the 2024 verification report (not conducted); the more recent verification report indicates FPIC was not carried out
- 18+ corrective actions required by the VVB, including unresolved questions on double-counting prevention (unique serial numbers), credit ownership transfer evidence, and stakeholder consultation compliance
- No lifetime ex-ante ERR figure found in any document, preventing a meaningful pro-rata over/under-delivery assessment
- Baseline is project-specific with no reassessment date stated, and the PDD dates from 2015/2020
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 6,344 | 6,344 | 0 | |
| 2023 | 8,440 | 0 | 8,440 | |
| Total | 14,784 | 6,344 | 8,440 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
5% quantified deduction with justification
Project-specific, no reassessment date stated
Grievance mechanism present; FPIC not conducted per 2024 VR
CCP-eligible; CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →